Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Gunville Phase I + (Upstream of Gunville hatches, prior to project delivery)
- Case study:Meades water garden regeneration project + (Downstream of the bridge during construction (top) and post-restoration (below))
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Map of the restoration area)
- Case study:Restorations of River Nolån-Hulta dam removal + (Upstreams from the dam (photo. Maria Arola))
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Urban River Landscape Graz - Recreation and chilling areas at the waterfront (Capital of Styria) 2004 – ongoing ©freiland)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Restoration of Vantaanjoki River + (Vantaanjoki River after restoration (photo: Olli Toivonen).)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (Newly created filled berms – August 2012 ©Environment Agency)
- Case study:River Alt at Knowsley + (Vegetated channel threads)
- Case study:River Nent: Abandoned Metal Mines + (Vertical Flow Pond diagram)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Restoration of Vesselina River + (Vesselina River - before restoration)
- Case study:Ullswater Catchment Restoration + (Ullswater CIC hedgerow creation)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (View along sea wall (saline lagoon to left, fronting tidal flats with sedimentation fields to right) (Taken by: S. Armstrong, ABPmer, 2001))
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:Aston Clinton River Restoration + (Flooding over BCC and ACPC land)
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Harbertonford Flood Alleviation Scheme + (View look upstream towards outlet of flood storage reservoir, with flow control structure. Courtesy of the River Restoration Centre.)
- Flood detention basin (HRB) Ickern-Mengede + (View on one of the basins)
- Case study:Salzano wetland and Marzenego river restoration project + (Map of Salzano wetland)
- Case study:Restoration of the marsh "Gallega" + (Aerial view of Gallega marsh in October 2004)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Aerial view of the renatured Fontenelle. Spring 2011 (Arnaud Rosan, SMBVCS))
- Case study:Removal of the Stalapos weir over the river Alagnon + (The Stalapos weir in january 2008, before the removal works)
- Case study:Remeandering of the Drésine and of the Remoray stream + (View on the marsh of the Remoray Lake, in October 2008.)
- Case study:Upper Emscher + (Upper Emscher in Dortmund Schüren during construction)
- Case study:Vindel River LIFE + (nVindel River Lifen Lidsbacken_before restoration)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:Riverlands Porlock Vale Streams + (River Aller Stage 0)
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Ecological Restoration of Vlascuta Lake + (Vlascuta area before works)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)