Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (The straight bed of a tributary of the Clauge in 2005, prior to the remeandering works.)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Historic Mill Restoration Project + (Lateral sheet piling used to create the weir)
- Case study:Rio Tepice urban restoration + (Bioengineering works)
- Case study:Restoring the natural dynamics of the upper Adour + (An alluvial bar on the upper Adour before (above) and after (opposite) the works. (Source: Véronique de Billy – Onema).)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Glinščica tributary (on the left) and treatment ditch (on the right) with a new river bed with meanders (Vzdrževanje …, 2009).)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Earthwork to restore a side channel and ponds. October 2007. (Voies navigables de France (VNF).)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (The La Motte reservoir, on the Sanguèze river, in 2003, before works.)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (Before works)
- Case study:Restoring the River Doquette to its original bed + (The Doquette in June 2008, prior to restoration with its raised bed (on the left) and its natural bed now used as a drainage ditch (on the right).)
- Case study:River restoration on the River Brett at Shelley + (An elongated berm feature on the River Brett near Layham)
- Case study:Fairham Brook Restoration Project + (Prior to the stakes being cut and wiring in the coir rolls.)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:Highland Water at Warwickslade Lawn + (Addition of woody debris to the river to significantly reduce flow velocities, October 2009)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Aerial view of Aguanaz River between Hoznayo and Entrambasaguas)
- Case study:Aubourn Rock Ramp and Habitat Works + (Weir Pre-works)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:Syston and Barkston Restoration + (Tree works)
- Case study:Trees on the River Uck + (Trees on the River Uck Project catchment map)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Lake Cerknica in autumn (Photo: Notranjska Regional Park archive))
- Case study:River Wandle Restoration Project + (Trout spawning on the Carshalton arm, November 2012, © T. Longstaff (Wandle Trust))
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (Dolna topchia Reserve_1)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Aerial view of Guyame)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Ullswater Catchment Restoration + (Ullswater CIC hedgerow creation)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Source to Sea Programme – 10. River Gilpin, Foulshaw and Winster Restoration + (Underbarrow Beck - New fence line)
- Case study:River Avon Habitat Enhancement, Fifield + (Undertaking in-channel works)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Map of instream restoration sites - Aboyne & Banchory)
- Case study:Upper Emscher + (Upper Emscher in Dortmund Schüren during construction)
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:Small water retention measures in Haluzice Gorge + (Lower part of the Haluzice Gorge with 4 m high stone weir (Source Richard Muller, GWP Eastern Europe))
- Case study:Marsh restoration on the Merlue + (The Merlue just downstream the marsh in summer 2009. The bed moved [on the left] on the edge of the marsh [on the right] has been filled during the restoration works.)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Ouzel habitat improvement + (Upstream deflector installation)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)