Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (The pont Paillard weir, before works, in June 2008.)
- Case study:Removal of five Lakes on the Val des Choues stream + (The most upstream pond is retained. It is a site of heritage interest (historic and faunistic).)
- Case study:Removal of the Fatou dam on the Beaume river + (The Fatou dam in April 2004.)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Bed scouring of the Drac into the clay, loss of riparian vegetation and a landslide, in November 2011 (Bertrand Breilh, CEDA).)
- Case study:Inchewan Burn Bed restoration + (The restored burn)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (The coupeau impoundment.)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (Rio Mareta in 2005, before restoration works.)
- Case study:Restoration of the River Korvajoki + (The river Korvajoki before any restoration work (year 2011).)
- Case study:River Quaggy- Chinbrook meadows + (The river Quaggy in Chinbrook meadows before restoration)
- Case study:River Cole- Life Project + (Construction of the meanders)
- Case study:Restoration of the previous riverbed of the Dadon + (The Dadon riverbed, before restoration, in June 2004.)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Aerial view before works)
- Case study:Welland for People and Wildlife Project + (Welland catchment)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Enhancement of the River Crouch following a pollution incident + (The existing river had a straight planform)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (The dam site of Saint-Étienne-du-Vigan in 1996, after the plant demolition.)
- Case study:Removal and opening of sluice gates on the Vence River + (The sluice gate of Saint-Marceau in March 2007, three years after its opening.)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (The Canche at Conchy-sur-Canche before dismantling of the sluice.)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (River Rhine, Albruck / Dogern (D): Diversion of the discharge into two courses: rock cascade pass, vertical slot pass with collection gallery.)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (The straight bed of a tributary of the Clauge in 2005, prior to the remeandering works.)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Historic Mill Restoration Project + (The structure once vegetated)
- Case study:Rio Tepice urban restoration + (Bioengineering works)
- Case study:Restoring the natural dynamics of the upper Adour + (An alluvial bar on the upper Adour before (above) and after (opposite) the works. (Source: Véronique de Billy – Onema).)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Glinščica tributary (on the left) and treatment ditch (on the right) with a new river bed with meanders (Vzdrževanje …, 2009).)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Earthwork to restore a side channel and ponds. October 2007. (Voies navigables de France (VNF).)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (The La Motte reservoir, on the Sanguèze river, in 2003, before works.)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (Before works)
- Case study:Restoring the River Doquette to its original bed + (The Doquette in June 2008, prior to restoration with its raised bed (on the left) and its natural bed now used as a drainage ditch (on the right).)
- Case study:River restoration on the River Brett at Shelley + (An elongated berm feature on the River Brett near Layham)
- Case study:Fairham Brook Restoration Project + (Prior to the stakes being cut and wiring in the coir rolls.)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:Highland Water at Warwickslade Lawn + (Addition of woody debris to the river to significantly reduce flow velocities, October 2009)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Aerial view of Aguanaz River between Hoznayo and Entrambasaguas)
- Case study:Aubourn Rock Ramp and Habitat Works + (Weir Pre-works)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:Syston and Barkston Restoration + (Tree works)
- Case study:Trees on the River Uck + (Trees on the River Uck Project catchment map)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Lake Cerknica in autumn (Photo: Notranjska Regional Park archive))
- Case study:River Wandle Restoration Project + (Trout spawning on the Carshalton arm, November 2012, © T. Longstaff (Wandle Trust))
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (Dolna topchia Reserve_1)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Aerial view of Guyame)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)