Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Maisons Rouges dam before the removal.)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel sinuosity was increased as a result of the scheme)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Marsh protection in Egyek–Pusztakócs + (The hydrological reconstruction has caused the rapid regeneration of the marshes, with their areal extent increasing to 26-28% (habitat map from 2001) (Source: GWP Eastern Europe, See file in references).)
- Case study:Lippenbroek Regulated Tidal Exchange Scheme + (The inlet structure at high tide)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Removal and opening of sluice gates on the Vence River + (The sluice gate of Saint-Marceau in March 2007, three years after its opening.)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (The location of Babingley River)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (The location of Burn River)
- Case study:Nine Chalk Rivers Project - Glaven Catchment + (The location of Glaven Catchment)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (The location of Heacham River)
- Case study:Nine Chalk Rivers Project - Hun Catchment + (The location of Hun River)
- Case study:Nine Chalk Rivers Project - Ingol Catchment + (The location of Ingol River)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (The location of Mun River)
- Case study:Nine Chalk Rivers Project - Gaywood Catchment + (The location of River Gaywood)
- Case study:Nine Chalk Rivers Project - Stiffkey Catchment + (The location of Stiffkey Catchment)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Abbotts Hall Managed Realignment Scheme + (The managed realignment at Abbotts Hall (shortly after first inundation;breaches circled in pink) - Google Earth derived aerial view)
- Case study:Ruppoldingen + (The map and plan of Ruppoldingen fishpass.)
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (The map with the area)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (The meadow after restoration of the wetland (2014) (SCA Tissue France).)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (The channelized Merloz presents a very poor habitat diversity (September 2004).)
- Case study:Removal of five Lakes on the Val des Choues stream + (The most upstream pond is retained. It is a site of heritage interest (historic and faunistic).)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (The Sénarpont weir, a total barrier for fish, in 2012 prior to the works (Stéphane Forgeois, Onema).)
- Case study:Marsh restoration on the Merlue + (The Merlue just downstream the marsh in summer 2009. The bed moved [on the left] on the edge of the marsh [on the right] has been filled during the restoration works.)
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (The pont Paillard weir, before works, in June 2008.)
- Case study:Restoration of the previous riverbed of the Dadon + (The Dadon riverbed, before restoration, in June 2004.)
- Case study:Removal of the Fatou dam on the Beaume river + (The Fatou dam in April 2004.)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Bed scouring of the Drac into the clay, loss of riparian vegetation and a landslide, in November 2011 (Bertrand Breilh, CEDA).)
- Case study:Inchewan Burn Bed restoration + (The restored burn)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (The coupeau impoundment.)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (Rio Mareta in 2005, before restoration works.)
- Case study:Restoration of the River Korvajoki + (The river Korvajoki before any restoration work (year 2011).)
- Case study:River Quaggy- Chinbrook meadows + (The river Quaggy in Chinbrook meadows before restoration)