Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Marden at Calne + (River Marden before restoration looking downstream)
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Sharpsbridge rock ramp fish easement post construction © Royal HaskoningDHV)
- Case study:Source to Sea Programme – 11. River Rawthey + (River Rawthey: new fencing of the riparian zone)
- Case study:River Rea Restoration Project + (River Rea Restoration Project Area)
- Case study:Watercress Farm Rewetting Project + (River Restoration channel drone photography)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (River Rhine, Albruck / Dogern (D): Diversion of the discharge into two courses: rock cascade pass, vertical slot pass with collection gallery.)
- Case study:River Roding at Ray Lodge Park + (River Roding prior to the project)
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (River Riisijoki before the work.)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:Old Station Beat restoration, River Test at Bossington + (River Test - Bossington Estate (before 1) ©Cain Bio-Engineering Ltd.)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Sharpsbridge rock ramp fish easement post construction © Royal HaskoningDHV)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)
- Case study:Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) + (River Widening Weyern - Aerial view 2006 (LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007) ©Styrian Government)
- Case study:France Farm (Phase 1) A 9 + (River before hatches opened)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Eutrophic lake before the activities.)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (Map of the actuation area)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Aerial view of the restoration area)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Map of the restoration area in Lobon River)
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:River of Life + (River of Life pre-works (River Restoration Centre))
- Case study:Knepp Rewilding Project + (Completed works)
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (River Riisijoki before the work.)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (River widening Sicheldorf - Aerial view 2012 (ETZ-Project “DraMurCi” 2009-2013) ©Styrian Government)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (River widening St. Peter Au - Aerial view 2006 (LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015) ©freiland)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (River widening measure Gosdorf I - Aerial View 2008 (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) © freiland)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (River widening measure Gosdorf II - distributary outflow 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (The coupeau impoundment.)
- Case study:Fluvial restoration in River Carrión + (Aerial view of Carrion River between Pino del Río and Fresno del Río)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Map of the area of action)
- Case study:Ullswater Catchment Restoration + (Ullswater CIC hedgerow creation)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:Ruppoldingen + (The map and plan of Ruppoldingen fishpass.)