Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)
- Case study:Whit Beck River Restoration Project + (The heavily modified raised river channel)
- Case study:Welwick Managed Realignment Scheme + (Rear embankment construction and re-profiling at Welwick in 2005)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Restoration of side channels of the Loire and its tributaries + (Le Gros Ormeau side channel before reconnection work. August 1999. (DPPMA d’Indre-et-Loire).)
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Grovelands Park Wetlands + (Reedbed summer 2015)
- Case study:Llobregat river restoration + (Map of the restoration area)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Banks protected by sheet piles prior to the restoration works. Autumn 2010. (Communauté urbaine d’Arras).)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Le ruisseau de Trémeret avant les travaux, en septembre 2011 (Source: N.Hamel, Onema).)
- Case study:Resilient River + (Reinstated ford at Elton)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Fluvial river restoration of Tordera in Tordera + (Aerial view of the restoration area in 1956)
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Aerial view of the restoration area)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Mezzano Lake overview.)
- Case study:Restoration of the river area of the section of Betzuca stream + (Aerial view of the restoration area)
- Case study:LIFE Segura Riverlink (Through rivers) + (Scope of action)
- Case study:The South Cornwall River Improvement Project - St. Austell + (Abandoned crossing acting as a partial barrier to fish)
- Case study:Dam removal at Grönkullen, River Rolfsån + (Downstreams from the dam(photo. Maria Arola))
- Case study:Massadammen-dam removal in River Tabergsån + (Restored channel (photo. Maria Arola))
- Case study:Dam removal in River Stenån + ((photo. Maria Arola))
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Map of the restoration area)
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Le ruisseau de Trémeret avant les travaux, en septembre 2011 (Source: N.Hamel, Onema).)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (L’étang Fortier : installation d’un moine hydraulique (Source: Pierre Durlet – PNR Morvan).)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Reméandrage La Veyre avant les travaux de reméandrage en 2011 (Source: SMVVA).)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Aerial view of the renatured Fontenelle. Spring 2011 (Arnaud Rosan, SMBVCS))
- Case study:River Little Ouse at Thetford + (Reopening the meanders)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Surélargissement du cours d’eau au niveau d’un seuil sur le Mutterbach. Janvier 2009 (Source: Patrice Muller, AFB).)
- Case study:Restoration of Myllypuro brook + (Myllypuro brook sinousity after restauration(photo.Liisa Laitinen).jpg)