Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Little Ponton + (Post restoration)
- Case study:Restoration of Wandle Park + (During works)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Stainby Road, Colsterworth + (Newly installed Lincs Limestone Gravel Feature)
- Case study:Pow Burn Restoration Project + (Pre-restoration location B showing straight incised channel with disconneted riparian zone)
- Case study:River Little Ouse at Thetford + (Reopening the meanders)
- Case study:Knepp Rewilding Project + (Completed works)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:River Irwell Restoration Project + (Prestolee weir removal)
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Rottal Burn + (Prior to restoration - channel had been straightened)
- Case study:Fairham Brook Restoration Project + (Prior to the stakes being cut and wiring in the coir rolls.)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:Irpin river restoration + (Landuse pressures will be identified and solutions proposed (photo Vasiliy Kostiushyn))
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Aerial view of the restoration area)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Source to Sea Programme + (Project 1 - Leighton Moss)
- Case study:Salmons Brook Urban Diffuse Pollution Project + (Project Area)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Stage 0 channel restoration + (before works)
- Case study:VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) + (Guadiana river)
- Case study:Pearls in Peril LIFE+ GB Project - River Ehen + (Projects on the River Ehen funded by PiP)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Weir removal at Tile Kiln Park + (Pymmes Brook pre-works)
- Case study:Day Brook Rain Gardens + (Day Brook rain garden)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Restoration for fishery in the river Hammonjoki + (Rapid area of the Koveroinen (photo: Kasvio).)
- Case study:Long Preston Deeps Flood Plain Project + (Laser Scanner)
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)
- Case study:River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria + (Re-meandered River Lyvennet at Maulds Meaburn, Penrith, Cumbria)
- Case study:River Marden at Calne + (River Marden before restoration looking downstream)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)