Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Ford crossing - barrier to sediment and fish movement)
- Case study:Deculverting Djupsund stream + (Djupsund stream after deculvering. Picture: Miguel A. Segarra Valls)
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:Restoration of Wandle Park + (During works)
- Case study:Elgin Flood Alleviation Scheme + (Pansport Bridge aerial photograph - September 2014 © Royal HaskoningDHV)
- Case study:River Dearne at Mexborough + (Canalised reach before restoration works)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Long Preston Deeps Flood Plain Project + (Laser Scanner)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Wyndham Park, Grantham +
- Case study:Zero river restoration project + (Zero river after restoration)
- Case study:River rehabilitation on the River Wensum at Swanton Morley + (Newly created filled berms – August 2012 ©Environment Agency)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:Grantham Blue Green - Urban Reach + (Gravel being added to channel.)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA + (Original external pesticide handling area)
- Case study:Stainby Road, Colsterworth + (Newly installed Lincs Limestone Gravel Feature)
- Case study:Wyndham Park, Grantham + (Newly installed berm)
- Case study:Grantham Blue Green - Urban Reach + (Gravel being added to channel.)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Newly planted trees - Lower Tavy)
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (L’un des étangs de Branguily en avril 2008 (Source: Althis).)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Logie Burn Restoration Project + (July 2011)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Earthwork to restore a side channel and ponds. October 2007. (Voies navigables de France (VNF).)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (The Manzanares River near the historical Toledo Bridge by the early 20th century, showing the characteristic patterns of the near-natural multi-thread river channel (Photo source: Madrid City Council and CEDEX).)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Ålgårda Hyro power plant (photo. Outi Laamanen))
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Segura's River Bioremediation + (Brick application system into the river mud)
- Case study:Irpin river restoration + (Landuse pressures will be identified and solutions proposed (photo Vasiliy Kostiushyn))
- Case study:Twineham Weir Removal & In-channel Enhancements + (Twineham Tilting Gate Pre-Removal)
- Case study:Harbertonford Flood Alleviation Scheme + (View look upstream towards outlet of flood storage reservoir, with flow control structure. Courtesy of the River Restoration Centre.)
- Case study:River Alt at Knowsley + (River Alt prior to works)
- Case study:Refilling the meanders of the Colostre + (The Colostre canalised before restoration (1999).)
- Case study:Wellow Brook Habitat Enhancement Project + (Gravelled access ramp)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA + (Original external pesticide handling area)