Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the stream of the Partido + (Aerial view of the alluvial cone at the mouth of the Partido's creek. September 2004)
- Case study:Recovery "CañoTravieso" + (Aerial view in 1956)
- Case study:River restoration project of the stream of Vallvidrera + (Map of the restoration area)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Aerial view of the restoration area)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Map of the restoration area)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Map of the restoration area)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Map of the restoration area)
- Case study:Llobregat river restoration + (Map of the restoration area)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (Map of the restoration area)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Map of the restoration area)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (Map of the restoration area)
- Case study:Restoration of a section of Torrente de Can Sunyer passing through Martorelles + (Map of the restoration area)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (Map of the restoration area)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (Map of the restoration area)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Map of the restoration area)
- Case study:Environmental improvement project of the stream of Ruby + (Map of the restoration area)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Map of the restoration area in Lobon River)
- Case study:Darley Abbey Fish Pass Project + (Map with location)
- Case study:Salisbury Avon Restoration Project + (Map with the area)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Map with the location)
- Case study:Regeneration of the banks of the river Mape + (Aerial view of Mape River and its mouth in Oka River)
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:River Cleddau + (Bank section before works 2004 (courtesy of Salix Water & Wetland Services Ltd))
- Case study:River Nene Nature Improvement Area + (An example of improved urban marginal river habitat on the Nene)
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Chowder Ness Managed Realignment Scheme + (Aerial view of site in December 2006 (5 months post realignment) (taken by ABP))
- Case study:Welwick Managed Realignment Scheme + (Rear embankment construction and re-profiling at Welwick in 2005)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (The Manzanares River near the historical Toledo Bridge by the early 20th century, showing the characteristic patterns of the near-natural multi-thread river channel (Photo source: Madrid City Council and CEDEX).)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Mata-Radeanu area during the restoration works (1))
- Case study:River restoration on the River Brett at Shelley + (An elongated berm feature on the River Brett near Layham)
- Case study:Creation of a Constructed Farm Wetland + (Original site: pre-construction)
- Case study:Fluvial river restoration of Tordera in Tordera + (Aerial view of the restoration area in 1956)
- Case study:Logie Burn Restoration Project + (July 2011)
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Glinščica tributary (on the left) and treatment ditch (on the right) with a new river bed with meanders (Vzdrževanje …, 2009).)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Restoration of River Kävlingeån in Klingavälsån Naturreserve + (Meandering new stream channel (photo. Maria Arola))
- Case study:Skårhultsdammen bypass channel at River Knipån + (Meandering of the new stream (photo. Maria Arola))
- Case study:Dam removal in River Stenån + ((photo. Maria Arola))
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Scope of action)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Mezzano Lake overview.)
- Case study:Small water retention measures in Haluzice Gorge + (Lower part of the Haluzice Gorge with 4 m high stone weir (Source Richard Muller, GWP Eastern Europe))
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Healthy Rivers + (Blockage removed from Ebbw River)