Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Cuckolds Haven Nature Area + (History information panel)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Restoration of Ilabekken brook + (Ilabekken year 1896 (photo from Morten Bergan))
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Map of the area of action)
- Case study:The San Marcos weir removal + (Image of the Bernesga River before (left side) and after (right side) the works of removal. (CIREF).)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Longstreet A 91a +
- Case study:Longstreet A 91a + (Impoundment - Before)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Zero river restoration project + (Zero river after restoration)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Bristol Frome Diffuse Pollution Project + (In-ditch wetland to seperate clean water from dirty water before entering the Ladden Brook)
- Case study:Pearls in Peril LIFE+ GB Project - River Spey + (In-stream restoration and area of conservation action on the Upper Spey)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (A new buffer strip inside the enlarged bed section)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (Before restoration)
- Case study:Restoration and conservation of the protected site "Lozenski pat" - wetland + (Before restoration)
- Case study:Small water retention measures in Haluzice Gorge + (Lower part of the Haluzice Gorge with 4 m high stone weir (Source Richard Muller, GWP Eastern Europe))
- Case study:Restoration of Ingarskilanjoki River + (Ingarskilanjoki River before restoration (photo: Harri Aulaskari))
- Case study:Salzano wetland and Marzenego river restoration project + (Map of Salzano wetland)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:ReNaturalize + (Installation of flexible structure)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Eroded sections appeared in the banks following the collapse of metal sheet piles along the Moselle River. August 2008. (Patrick Adolph – VNF).)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (Old river crossing - with fish passes that do not work!)
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 - project overview)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Pantanello)
- Case study:The Fortuna Restoration Project + (Fortuna lake location (source: www.panoramio.com))
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Aerial view of the restoration area)
- Case study:Isar-Plan + (Isar river in Munich 2013)