Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (Jankowa (km 61+160 Biala River))
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Aerial view of Guadajoz River in Castro del Río (Córdoba))
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) + (Guadiana river)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Le ruisseau de Trémeret avant les travaux, en septembre 2011 (Source: N.Hamel, Onema).)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Healthy Rivers + (Blockage removed from Ebbw River)
- Case study:River Nene Nature Improvement Area + (An example of improved urban marginal river habitat on the Nene)
- Case study:Hierdense Beek + (De beek bij Staverden)
- Case study:Wyndham Park, Grantham + (Newly installed berm)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Syston and Barkston Restoration + (Hinged tree)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Cuckolds Haven Nature Area + (History information panel)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Restoration of Ilabekken brook + (Ilabekken year 1896 (photo from Morten Bergan))
- Case study:The San Marcos weir removal + (Image of the Bernesga River before (left side) and after (right side) the works of removal. (CIREF).)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Map of the area of action)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Longstreet A 91a + (Impoundment - Before)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Zero river restoration project + (Zero river after restoration)
- Case study:Bristol Frome Diffuse Pollution Project + (In-ditch wetland to seperate clean water from dirty water before entering the Ladden Brook)
- Case study:Pearls in Peril LIFE+ GB Project - River Spey + (In-stream restoration and area of conservation action on the Upper Spey)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (A new buffer strip inside the enlarged bed section)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (Before restoration)
- Case study:Restoration and conservation of the protected site "Lozenski pat" - wetland + (Before restoration)
- Case study:Small water retention measures in Haluzice Gorge + (Lower part of the Haluzice Gorge with 4 m high stone weir (Source Richard Muller, GWP Eastern Europe))
- Case study:Restoration of Ingarskilanjoki River + (Ingarskilanjoki River before restoration (photo: Harri Aulaskari))
- Case study:Salzano wetland and Marzenego river restoration project + (Map of Salzano wetland)