Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Kvarnekulla nature like bypass channel at River Knipån + (Meandering new stream (photo. Maria Arola))
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Gravel bar installed to block old straightened channel, pushing main flow around re-connected meander)
- Case study:Grantham Blue Green - Urban Reach + (Gravel being added to channel.)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (Gravel cover applied in the river (Check link below in "additional links and references" for source).)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Test and Itchen River Restoration Strategy + (Backwater/ fish refuge on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014)
- Case study:Wellow Brook Habitat Enhancement Project + (Gravelled access ramp)
- Case study:Aston Clinton River Restoration + (Flooding over BCC and ACPC land)
- Case study:Letting the Dove Flow + (An example of weir breaching)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Groundbreaking work in process)
- Case study:River Pool Linear Park Enhacement + (The restored river, complete with berms. April 2012)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (Jankowa (km 61+160 Biala River))
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Aerial view of Guadajoz River in Castro del Río (Córdoba))
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) + (Guadiana river)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Hull and East Riding Catchment Partnership + (Gypsey Race (map))
- Hull and East Riding Catchment Partnership + (Gypsey Race (map))
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (Le ruisseau de Trémeret avant les travaux, en septembre 2011 (Source: N.Hamel, Onema).)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Straightening of the Eau blanche river)
- Case study:Creating a fishpass at Włocławek dam + (Vistula River Natural Stretch. (Katarzyna Suska SSIFI).)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Healthy Rivers + (Blockage removed from Ebbw River)
- Case study:River Nene Nature Improvement Area + (An example of improved urban marginal river habitat on the Nene)
- Case study:Hierdense Beek + (De beek bij Staverden)
- Case study:Wyndham Park, Grantham + (Newly installed berm)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Syston and Barkston Restoration + (Tree works)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:Cuckolds Haven Nature Area + (History information panel)
- Case study:Rheinfelden bypass + (The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder))
- Case study:Restoration of Ilabekken brook + (Ilabekken year 1896 (photo from Morten Bergan))
- Case study:The San Marcos weir removal + (Image of the Bernesga River before (left side) and after (right side) the works of removal. (CIREF).)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Map of the area of action)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)