Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Eroded sections appeared in the banks following the collapse of metal sheet piles along the Moselle River. August 2008. (Patrick Adolph – VNF).)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Banks protected by sheet piles prior to the restoration works. Autumn 2010. (Communauté urbaine d’Arras).)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Map of the restoration area)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Aerial view of the area)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:River Little Ouse at Thetford + (Reopening the meanders)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Aerial view of Narcea River as it passes through Cornellana)
- Case study:Meades water garden regeneration project + (Downstream of the bridge during construction (top) and post-restoration (below))
- Case study:Restoration of Kalajoki River + (Catchment of River Kalajoki (Jouni Näpinkangas))
- Case study:The Babina Restoration Project + (The Babina polder before restoration)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Eutrophic lake before the activities.)
- Case study:Mayesbrook Climate Change Park restoration project + (Jubilee planting event, March 2012 © LBBD)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (The straight bed of a tributary of the Clauge in 2005, prior to the remeandering works.)
- Case study:Dove Weir removal + (Example of an existing weir upstream of works, August 2011)
- Case study:Houghton 'trout stream' enhancements + (Example of side deflector)
- Case study:East Tullos Burn Environment Improvements Project + (Selection of images of site before construction phase of project.)
- Case study:Langonnet river + (Examples of intervention on the Lagonnet river.)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Groundbreaking work in process)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (New deep flow gutters needed on traditional buildings to take water to new clean water drain)
- Case study:River Valency at Boscastle + (Reference reach upstream of Boscastle)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Skjern River Project + (Removal of an old pumping station)
- Case study:River Darent at Hawley Manor + (River Darent at Hawley Manor before works)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (Exemple d’un secteur rectifié sur la Souffel [mars 2012] (Source: Rémy Gentner, Eurométropole de Strasbourg).)
- Case study:Restoration of R. Odelouca 2 + (restored section: invasive species were erradicated and replaced by a willow after a cribwall structure)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Aerial view of the area)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)
- Case study:ReNaturalize + (Installation of flexible structure)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Savinhill Moss - tree clearance and abstraction by horse)
- Case study:Eddleston water + (New gravel side bar. Photo: Ulrika Åberg, RRC)
- Case study:New Forest LIFE project + (The old course of the stream)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Newly planted trees - Lower Tavy)
- Case study:Haltwhistle burn; a total catchment approach + (Electro-fishing with volunteers)
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Eden Crayfish Restoration Project + (Eden Catchment - ecological status)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Bristol Frome Diffuse Pollution Project + (In-ditch wetland to seperate clean water from dirty water before entering the Ladden Brook)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Crook Beck - Environment Agency inspecting new fences - where none had been before)