Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Test and Itchen River Restoration Strategy + (Backwater/ fish refuge on the Park Stream, Bossington Estate (tributary of the River Test) ©RRC June 2014)
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:River Avon Our Water Environment + (One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA))
- Case study:River Keekle Restoration + (Typical condition pre-restoration)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Exposed peat - erosion problem)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Colne Water Restoration Project + (Colne Water Restoration Area)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Eldbäcken + (Floodplain habitat during high flow conditions. Photo: Olle Calles)
- Case study:Upper Witham Restoration + (Colsterworth just after restoration.)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)
- Case study:Creation of a Constructed Farm Wetland + (Completed Wetland:)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)
- Case study:Bourne End Recreation Ground River Enhancement Project + (View downstream before work started)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Map of the area)
- Case study:Sunrise, River Trent, Staffordshire University + (Completed scheme 2020)
- Case study:Knepp Rewilding Project + (Completed works)
- Case study:Westborough + (Works being undertaken.)
- Case study:Welton Farm Landfill/Riverbank Works + (Historic Landfill)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature.)
- Case study:Skårhultsdammen bypass channel at River Knipån + (Meandering of the new stream (photo. Maria Arola))
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).)
- Case study:Spring Meadow Meander Restoration + (Upstream part of the project where Himalayan Balsam will need to be managed - © Nick Elbourne (RRC), October 2013)
- Case study:Restoration of Siuruanjoki River + (Catchment of Siuruanjoki River)
- Case study:Wallasea (North) Managed Realignment + (Dredge sediment recharging in November 2005)
- Case study:Elgin Flood Alleviation Scheme + (Pansport Bridge aerial photograph - September 2014 © Royal HaskoningDHV)
- Case study:Restoration of the river area of the section of Betzuca stream + (Aerial view of the restoration area)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:Rehabilitation of the river Segeråga + (Removing inorganic material (sludge/fine sand. Photo: Kjetil Hansen, Rødøy municipality)
- Case study:Restoration of Vakkolankoski Torrent + (Construction of the fishway)
- Case study:River Cole- Life Project + (Construction of the meanders)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Damming device on the channel constructed in the 1920s Source: Waldemar Mioduszewski and Tomasz Okruszko. GWP Poland.)
- Case study:River of Life + (River of Life pre-works (River Restoration Centre))
- Case study:Effacement du seuil de Carayon sur le Thoré + (Vue aval du seuil de Carayon, avant effacement, ponctué par plusieurs brèches sur le déversoir. Juillet 2011 (Source: Yannick Ramadier – Onema).)
- Case study:Minsterley Brook Abandoned Metal Mines + (Copyright Ian Watson Coal Authority)
- Case study:QUERCUS Ravensbourne + (Cornmill Gardens, facing upstream)
- Case study:The River Deerness Project + (Cornsay Colliery culvert)