Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Banks protected by sheet piles prior to the restoration works. Autumn 2010. (Communauté urbaine d’Arras).)
- Case study:Gilev's Grove reconstruction + (Klyuchi stream rehabilitation)
- Case study:Barking Creekmouth + (Barking Barrier site)
- Case study:Lower River Roding Regeneration Project + (A13 during works)
- Case study:Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Hull and East Riding Catchment Partnership + (Barmston Sea Drain (map))
- Case study:Barnes Common improvements + (Barnes Common Enhancement Dec 2011)
- Case study:Resilient River + (Barnwell Backchannel Interpretation Panel)
- Case study:Bocq river (Walphy - LIFE project) + (Bocq: Rehabilitation projects)
- Case study:Glenbrook Wetlands + (Creating basin 1)
- Case study:Prologis Midpoint Park river restoration scheme + (River Tame pre-restoration)
- Case study:Saving Chiswick Eyot + (Bathymetry and scans combined)
- Case study:Tall River + (Downstream bays after two years - 1998)
- Case study:Riverlands Porlock Vale Streams + (River Aller Stage 0)
- Case study:Biomura LIFE06NAT/SI/000066 + (New gravel bars)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Retention reservoir (photo by: W. Mioduszewski) GWP Eastern Europe)
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Bed scouring of the Drac into the clay, loss of riparian vegetation and a landslide, in November 2011 (Bertrand Breilh, CEDA).)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (Fish pass (lower))
- Case study:Allt Lorgy River Restoration + (Before - artificial embankment)
- Case study:Babingley River at Hillington + (Before Works - April 2006)
- Case study:River Wye Habitat Restoration Project + (New flow deflectors (High Wycombe District Council))
- Case study:Rio Sant'Ambrogio restoration project + (Before and after restoration)
- Case study:Sågarsfors + (Before dam removal (Jukka Jormola))
- Case study:The Pow Beck Improvement Project + (Pow Beck fencing and tree planting)
- Case study:Restoration of Longinoja brook + (Longinoja after restauration may 2006 (photo: Liisa Laitinen))
- Case study:Restoration of Rusenski Lom River near Ivanovo + (Before restoration)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Before restoration)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Before restoration)
- Case study:Restoration and conservation of the protected site "Lozenski pat" - wetland + (Before restoration)
- Case study:Restoration of Reinikkalankoski torrent + (Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_1)
- Case study:Short Heath Brook Project + (Before the project commenced)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Arrival of mechanisation at the entry to the lake)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Before works)
- Case study:River Soar fish refuge and wetland scrape + (Before works)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (Before works)
- Case study:Braid Burn at Inch Park + (Before works - April 2006)