Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Highland Water at Warwickslade Lawn + (Addition of woody debris to the river to significantly reduce flow velocities, October 2009)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Saltburn Gill ironstones mines + (Mine discharge point)
- Case study:Castle Irwell Urban Wetland + (Aerial photo of wetland)
- Case study:Swindale Beck Restoration + (Swindale Beck restoration work in progress)
- Case study:River Cole- Life Project + (Construction of the meanders)
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Aerial view before works)
- Case study:Recovery of the functionality of Brazo de la Torre + (Aerial view in 1956)
- Case study:Recovery "CañoTravieso" + (Aerial view in 1956)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Aerial view of 1956)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Aerial view of 2009)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (Aerial view of Aguanaz River between Hoznayo and Entrambasaguas)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Map of the area of action)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Birth of Asón River in Cailagua waterfall)
- Case study:Fluvial restoration in River Carrión + (Aerial view of Carrion River between Pino del Río and Fresno del Río)
- Case study:Restoration of the marsh "Gallega" + (Aerial view of Gallega marsh in October 2004)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Aerial view of Guadajoz River in Castro del Río (Córdoba))
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Aerial view of Guadalquivir River and Montaña del Río town. 2005)
- Case study:Guadiamar Green Corridor Project + (Aerial view)
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Aerial view of La Coronada, municipality where a green filter has been placed)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Aerial view of Guyame)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Aerial view of Insua de San Roque, one of the restoration areas)
- Case study:Restoration of a stream of the Jarama River, Valdetorres de Jarama + (Aerial view of Jarama River near Valdetorres del Jarama)
- Case study:Regeneration of the banks of the river Mape + (Aerial view of Mape River and its mouth in Oka River)
- Case study:Weir demolition in river Nansa, Cantabria + (Aerial view of Nansa River in Camijares)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Aerial view of Narcea River as it passes through Cornellana)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Map of the restoration area)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Map of the actuation area)
- Case study:River restoration project in Sella, Asturias + (Aerial view of Sella River downstream Arriondas)
- Case study:Vallacuera Ravine. Removal of a dyke + (Aerial view of Vallacuera ravine)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Map of the restoration area)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (Aerial view of remeandered River Leith at Thrimby, Penrith, Cumbria)
- Case study:River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria + (Re-meandered River Lyvennet at Maulds Meaburn, Penrith, Cumbria)
- Case study:Chowder Ness Managed Realignment Scheme + (Aerial view of site in December 2006 (5 months post realignment) (taken by ABP))
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (Map of the actuation area)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (Aerial view of the actuation area)