Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Dam removal in River Stenån + ((photo. Maria Arola))
- Case study:Restoration of River Kävlingeån in Klingavälsån Naturreserve + ((photo. Maria Arola))
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Ålgårda Hyro power plant (photo. Outi Laamanen))
- Case study:Wild Wylye Phase 1 + (Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.)
- Case study:Upper Emscher + (Upper Emscher in Dortmund Schüren during construction)
- Case study:Lippenbroek Regulated Tidal Exchange Scheme + (The inlet structure at high tide)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Aerial view of Narcea River as it passes through Cornellana)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (2013 River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015) © freiland - Christine Konradi)
- Case study:Ennerdale Mill Weir Removal + (View from below the weir, highlighting the extent of the drop in water levels)
- Case study:Saving Chiswick Eyot + (Old Chiswick Conservation Area. London borough of Hounslow)
- Case study:River Alt and Croxteth Brook Restoration Project. + (Original river flowing into culvert)
- Case study:River Worfe Restoration Initiative + (APEM scientist undertaking catchment survey on the Worfe)
- Case study:Arborfield nature like bypass and weirs project + (Small fixed-crest weir prior to lowering. Courtesy of Wild Trout Trust and the Environment Agency.)
- Case study:River restoration on the River Brett at Shelley + (An elongated berm feature on the River Brett near Layham)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature.)
- Case study:River Idle Restoration Project + (Aerial photo of erosion at Scaftworth)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (A distribution weir allows to get water into the meander (October 2008).)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (A flap on the Couasnon at Chavaignes, prior to its opening.)
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (A new buffer strip inside the enlarged bed section)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (The La Motte reservoir, on the Sanguèze river, in 2003, before works.)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (A pool on the Thouet River in 2004, before the lowering of the water level.)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (The Steinbaechlein in October 2007, two years after restoration.)
- Case study:Wensum River Restoration and Floodplain Enhancement + (A stretch of the river pre-restoration)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (The straight bed of a tributary of the Clauge in 2005, prior to the remeandering works.)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (The Canche at Conchy-sur-Canche before dismantling of the sluice.)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (The Manzanares River near the historical Toledo Bridge by the early 20th century, showing the characteristic patterns of the near-natural multi-thread river channel (Photo source: Madrid City Council and CEDEX).)
- Case study:Lower River Roding Regeneration Project + (A13 during works)
- Case study:The South Cornwall River Improvement Project - St. Austell + (Abandoned crossing acting as a partial barrier to fish)
- Case study:Upper River Nairn restoration project + (Aberarder - New Lower Channel)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (The pont Paillard weir, before works, in June 2008.)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Un des ouvrages problématiques sur la Luire à Clos Merle (2008) (Source: SIAG).)
- Case study:Wyndham Park, Grantham + (Newly installed berm)
- Case study:Restoration of riparian zone in Aragon River + (Map of the area of action)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Aerial view of 1956)
- Case study:Massadammen-dam removal in River Tabergsån + (Restored channel (photo. Maria Arola))
- Case study:Nar SSSI project + (Deflector transformed to shoulder, March 2011)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (River Rhine, Albruck / Dogern (D): Diversion of the discharge into two courses: rock cascade pass, vertical slot pass with collection gallery.)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Creek and main river (photo: Arne Jørgen))
- Case study:Highland Water at Warwickslade Lawn + (Addition of woody debris to the river to significantly reduce flow velocities, October 2009)