Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Doñana 2005 + (After measures implemented)
- Case study:Adams Mill enhancements + (No)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (No)
- Case study:Drayton + (No)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (Yes)
- Case study:Marsh restoration on the Merlue + (No)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (No)
- Case study:Ouzel habitat improvement + (No)
- Case study:The Babina Restoration Project + (Yes)
- Case study:The Fortuna Restoration Project + (Yes)
- Case study:HLS New Forest + (No)
- Case study:Lunterse Beek + (No)
- Case study:Rfff + (No)
- Case study:MediCyn + (No)
- Case study:Rehabilitation of the river Segeråga + (No)
- Case study:River Calder Large Wood Structure installation + (No)
- Case study:Restoring Brent Rivers and Communities + (No)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Yes)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (Yes)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Yes)
- Case study:Buiten Ooij + (Yes)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Yes)
- Case study:Abbotts Hall Managed Realignment Scheme + (Yes)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Yes)
- Flood detention basin (HRB) Ickern-Mengede + (Yes)
- Case study:Ems floodplain + (Yes)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Yes)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Yes)
- Case study:Aaijen- Removal of bank fixation + (Yes)
- Case study:Glaisdale Beck diversion scheme + (Yes)
- Case study:Guadiamar Green Corridor Project + (Yes)
- Case study:Arborfield nature like bypass and weirs project + (Yes)
- Case study:Fluvial restoration in River Carrión + (Yes)
- Case study:Ladywell Fields (QUERCUS) + (Yes)
- Case study:Isar-Plan + (Yes)
- Case study:Conservation of alluvial + (Yes)
- Case study:Enler River enhancement project + (Yes)
- Case study:HPP Blanca + (Yes)
- Case study:Langonnet river + (Yes)
- Case study:Eldbäcken + (Yes)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Yes)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Yes)
- Case study:Nar SSSI project + (Yes)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Yes)
- Case study:Mayesbrook Climate Change Park restoration project + (Yes)
- Case study:New Forest LIFE project + (Yes)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Yes)
- Case study:Rehabilitation of Benta stream + (Yes)
- Case study:Recovery of the functionality of Brazo de la Torre + (Yes)
- Case study:Opijnen- Side channel + (Yes)