Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the river continuity on the Touques Basin + (the départements of Calvados)
- Case study:Restoration of the river continuity on the Touques Basin + (Ministry of the Environment)
- Case study:Restoration of side channels of the Loire and its tributaries + (Water agency Loire - Bretagne (AELB))
- Case study:Crane Park + (Biffaward secured)
- Case study:Roxbourne Park + (Biffaward secured)
- Case study:Yeading Brook fields - Reedbed creation + (Biffaward secured)
- Case study:Rainham Marshes + (£42k secured from NEAS led EA tidal sluice upgrade project)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (Agence de l’eau)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (Union européenne 50 %)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Agence de l’eau (35 %))
- Case study:Effacement du seuil de Carayon sur le Thoré + (État (40 %))
- Case study:Improving the structure of the Lahn-patak in Hungary + (LIFE (LIFE04 NAT/AT/000001))