Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Off-Channels Restauration + (FEDER)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Regional Council of Burgundy)
- Case study:River Keekle Restoration + (Water Environment Fund)
- Case study:Goldrill Beck River Restoration + (Environment Agency)
- Case study:Kirkstone Beck River Restoration + (Water Environment Grant)
- Case study:Hills to Levels + (Local Growth Fund)
- Case study:Evenlode Catchment Project + (Thames RFCC local levy)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Water Programe)
- Case study:Restoration of side channels of the Loire and its tributaries + (Water agency Loire - Bretagne (AELB))
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Regional Directorate for the Environment (DIREN): 20.5%)
- Case study:Kleine Aa, traject Smalwater Noord + (Province Noord-Brabant)
- Case study:Blackbrook Slow the Flow, St Helens + (Natural England)
- Case study:Beneden-Berkel + (Waterschap Rijn & IJssel)
- Case study:Investigating the Impacts of Upland Land Use Management on Flood Risk at Pontbren, Wales + (EPSRC)
- Case study:Rhymney Great Wharf + (Welsh Government)
- Case study:Poole Bay Beach Replenishment Trial + (Defra)
- Case study:River Avon at East Chisenbury + (Wessex Chalk Streams Project)
- Case study:River Avon Restoration Project + (Wessex Flood Defence Grant-in-Aid)
- Case study:Bathgate Watercourse Restoration Project + (Scottish Government)
- Case study:Improving the structure of the Lahn-patak in Hungary + (LIFE (LIFE04 NAT/AT/000001))
- Case study:River Glaven conservation group + (Wild Trout Trust)
- Case study:Medland Close, River Wandle + (Environment Agency)
- Case study:Langford Lakes project + (Wiltshire wildlife trust)
- Case study:Malden Golf Course + (Environment Agency)
- Case study:Worcester Park + (Environment Agency)
- Case study:Wimbledon Common + (Environment Agency)
- Case study:Eddleston water + (Woodland Trust)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Woodland Trust)
- Case study:Sussex Flow Initiative + (Woodland Trust)
- Case study:Morava restoration project + (World Bank)
- Case study:Restoration of Siuruanjoki River + (European Regional Development Fund)
- Case study:Rodley weir by pass channel + (Yorkshire Water 95% Environment Agency 5%)
- Case study:Biomura LIFE06NAT/SI/000066 + (Ministry for environment and spatial planning)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Life (Union européenne)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (The total cost of the project was 1 705 000 PLN (approximately 420 000 €). Share of the input of the company “National Forests” was 27%. Funds were also obtained from the District Fund for Environmental Protection and Water Management)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Agence de l’eau (30 %))
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (Agence de l’eau)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Conseil général)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (Agence de l’eau (40 %))
- Case study:Removal of the Stalapos weir over the river Alagnon + (Agence de l’eau (40 %))
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (Union européenne 50 %)
- Case study:Effacement du seuil de Carayon sur le Thoré + (État (40 %))
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Agence de l’eau Artois-Picardie (50 %))
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (fédération départementale de la pêche)
- Case study:Removal of a pond weir in a tributary of Petersbach + (EU Interreg IIIA (50 %))
- Case study:Houndsden Road Rain Gardens + (London Borough of Enfield)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Agence de l’eau Loire-Bretagne (50 %)
- Case study:Restoration of side channels of the Loire and its tributaries + (Water agency Loire - Bretagne (AELB))
- Case study:Enhancements in Hampstead Heath + (GLA)
- Case study:Removal of the Cussy weir on the Maria stream + (Agence de l’eau)
- Case study:Long Eau (Great Eau) + (environmental stewardship scheme)
- Case study:River Somer channel enhancement, Midsomer Norton + (fundraising by the River Somer Management Team)
- Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River + (funds of the Ministry of the Interior and Administration of Poland)