Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Reopening and restoration of the stream Hovinbekken + (Oslo municipality)
- Case study:Reopening of Mjølløst stream + (The Norwegian Environmental Agency (Miljødirektoratet))
- Case study:Habitat improvement measures in Bortneelva + (Svelgen Kraft AS)
- Case study:Habitat measures in Strynevassdraget + (The Norwegian Water Resources and Energy Directorate (NVE))
- Case study:Restoration of the river Børselva + (Ballangen Energi AS)
- Case study:Inturia dam removal + (The first two stages of the Inturia dam removal were carried out within the scope of the Guratrans project (EFA221/11) while the following two were carried out within the scope of the LIFE Irekibai project (LIFE 14 NAT/ES/00186).)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (The total cost of the project was 1 705 000 PLN (approximately 420 000 €). Share of the input of the company “National Forests” was 27%. Funds were also obtained from the District Fund for Environmental Protection and Water Management)
- Case study:MediCyn + (This project was financed by the European Union (433 513 € – 50 %))
- Case study:River Monnow (Going Native) + (Environment Agency)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (LIFE project 338.101€)
- Case study:Babingley River at Hillington + (Total cost: €695.00. Environment Agency and Hillington Fly Fishing Club)
- Case study:The Verdier marshes + (Tour du Valat and local municipal funds)
- Case study:Doñana 2005 + (C.H.Guadalquivir)
- Case study:Sågarsfors + (Centre for Economic Development)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Travaux d’arasement réalisés en régie par la société de pêche du Bagas)
- Case study:Devon Beaver Project and River Otter Beaver Trail + (Natural England)
- Case study:Tichborne River Restoration Project + (Environment Agency)
- Case study:LIFE Segura Riverlink (Through rivers) + (UE (49.83%))
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (UE founds (FESR 2007-2013))
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (UE founds (LIFE02 NAT/IT/008572))
- Case study:Kentchurch Weir Removal + (UK European Fisheries Fund Operational Programme)
- Case study:Vindel River LIFE + (European Commission)
- Case study:Frog Island + (Unconfirmed at this stage)
- Case study:Moor Lane Allotments + (Unconfirmed funding source)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (Agence de l’eau)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Union européenne (18 %))
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (Union européenne 50 %)
- Case study:Swindale Beck Restoration + (Environment Agency)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (Research council)
- Case study:Vindel River LIFE + (European Commission)
- Case study:Heybarnes Recreation Ground Cole Restoration + (EA WEIF)
- Case study:Devon Beaver Project and River Otter Beaver Trail + (Natural England)
- Case study:Restoration of Naarkoski Torrent + (SYKE)
- Case study:LIFE+ Traisen + (VERBUND (15 million euros) and other financing partners: Office of the Lower Austrian Provincial Government Federal Ministry of Agriculture)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”)
- Case study:Zero river restoration project + (Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”)
- Case study:Scolo Desolino restoration project + (Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”)
- Case study:Rio Sant'Ambrogio restoration project + (Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”)
- Case study:Pagana canal restoration project + (Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”)
- Case study:Salzano wetland and Marzenego river restoration project + (Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000”)
- Case study:Dagenham Washlands Phase 2 + (European Regional Development Fund)
- Case study:Brackenhurst Natural Flood Management + (Environment Agency)
- Case study:Poulter Park + (Viridor)
- Case study:Wandle Valley Wetlands + (Viridor)
- Case study:Ravensbury Park + (Viridor funding)
- Case study:Beddington Park + (Viridor funding)
- Case study:Vallacuera Ravine. Removal of a dyke + (Government of Navarra)
- Case study:Restoration of riparian zone in Aragon River + (Government of Navarra)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Rhône-Méditerranée-Corse water agency (60%))
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Rhin-Meuse water agency (50%))
- Case study:Restoration of Enningdalsälv River + (European Regional Development Fund)