Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Harbertonford Flood Alleviation Scheme + (Defra)
- Case study:Belton Floodplain Reconnection and River Restoration + (Leader+ European Structural Fund)
- Case study:Exmoor Mires Partnership + (South West Water)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Sport Asistance)
- Case study:Chambers Wharf + (St Martins Property Investments Ltd)
- Case study:Kuuskoski-Fishway + (European Union)
- Case study:Rheinauen bei Rastatt + (European Commission)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (European Union)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Statkraft AS)
- Case study:Restoration of spawning grounds for trout in Bjornesfjorden (Hardangervidda) + (Statkraft AS)
- Case study:Fordmill weir + (Still to be confirmed)
- Case study:Habitat measures in Strynevassdraget + (The Norwegian Water Resources and Energy Directorate (NVE))
- Case study:Sussex Flow Initiative + (Environment Agency)
- Case study:Rye Harbour Farm Regulated Tidal Exchange + (Flood Defence Grant-in-Aid)
- Case study:Silverån övre + (European Union)
- Case study:Habitat improvement measures in Bortneelva + (Svelgen Kraft AS)
- Case study:The Upper Raba River Spawning Grounds + (Swiss Contribution to the Enlarged European Union)
- Case study:Reopening of the culverted Redon river + (Agence de l’eau (Water Agency) (31%))
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Agence de l’eau Artois-Picardie (80 %))
- Case study:Effacement du seuil de Carayon sur le Thoré + (État (40 %))
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Water Agency)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Tarragona Provincial Government)
- Case study:Lustrum Beck Flood Alleviation Scheme: Phase 2 + (Flood and Coastal Risk Management)
- Case study:Tutta Beck + (Heritage Lottery Fund (HLF))
- Case study:Southington River Restoration Project + (Test and Itchen River Restoration Strategy)
- Case study:Evenlode Catchment Project + (Thames RFCC local levy)
- Case study:Mayesbrook Climate Change Park restoration project + (London Borough of Barking and Dagenham)
- Case study:Mayes Brook River Restoration, Mayesbrook Park, East London + (London Borough of Barking and Dagenham)
- Case study:Arborfield nature like bypass and weirs project + (Defra)
- Case study:Hogsmill Sewage Treatment Works phase 1 + (Thames Water)
- Case study:Glenbrook Wetlands + (Defra)
- Case study:Grovelands Park Wetlands + (Defra)
- Case study:Rewilding Enfield's Urban Rivers + (Defra)
- Case study:Hackbridge weir notch + (Landfill (Viridor))
- Case study:River Wandle: Butter Hill Phase 1 + (Environment Agency)
- Case study:Ravensbury Park + (Viridor funding)
- Case study:Poulter Park + (Viridor)
- Case study:Beddington Park + (Viridor funding)
- Case study:Wandle Valley Wetlands + (Viridor)
- Case study:The Ciobarciu Wetland Project + (The Netherlands Government programme MATRA; Co-financing Ministry of Environment and Water Management)
- Case study:Restoration of the river Akerselva + (Oslo municipality)
- Case study:Reopening and restoration of the stream Hovinbekken + (Oslo municipality)
- Case study:Reopening of Mjølløst stream + (The Norwegian Environmental Agency (Miljødirektoratet))
- Case study:Habitat improvement measures in Bortneelva + (Svelgen Kraft AS)
- Case study:Habitat measures in Strynevassdraget + (The Norwegian Water Resources and Energy Directorate (NVE))
- Case study:Restoration of the river Børselva + (Ballangen Energi AS)
- Case study:Inturia dam removal + (The first two stages of the Inturia dam removal were carried out within the scope of the Guratrans project (EFA221/11) while the following two were carried out within the scope of the LIFE Irekibai project (LIFE 14 NAT/ES/00186).)