Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Grantham Blue Green - Urban Reach + (Leader+ European Structural Fund)
- Case study:Restoration of the previous riverbed of the Dadon + (Water Agency)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (SRDP)
- Case study:Restoration of Naarkoski Torrent + (SYKE)
- Case study:Sågarsfors + (Centre for Economic Development)
- Case study:Castle Irwell Urban Wetland + (Environment Agency Grant in Aid)
- Case study:Restoration of the river area of the section of Betzuca stream + (Sant Quirze del Vallès Natura Association)
- Case study:Diversion of the River Nith + (Scottish Coal)
- Case study:South Esk restoration + (Scottish Environment Protection Agency)
- Case study:Rottal Burn + (Scottish Environment Protection Agency)
- Case study:Allt Lorgy River Restoration + (CNPA)
- Case study:Burn of Balmaleedy Restoration, Marykirk + (Aberdeenshire Council)
- Case study:Bathgate Watercourse Restoration Project + (Scottish Government)
- Case study:Welton Farm Landfill/Riverbank Works + (Local Authorities)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (North Lanarkshire Council)
- Case study:Inchewan Burn Bed restoration + (Scottish Environment Protection Agency)
- Case study:Nigg Bay Managed Realignment Scheme + (Heritage Lottery Fund (HLF))
- Case study:Logie Burn Restoration Project + (Scottish Environment Protection Agency)
- Case study:Dunruchan Farm Peatland Restoration Project + (Scottish Natural Heritage)
- Case study:Eddleston water + (Scottish Government)
- Case study:River Avon Our Water Environment + (Scottish Rural Development Programme)
- Case study:South Calder Water deculverting and habitat restoration + (Scottish Water Environment Fund (WEF))
- Case study:Burn of Balmaleedy Restoration, Marykirk + (Scottish Water Environment Fund (WEF))
- Case study:Upper River Nairn restoration project + (Scottish Water Environment Fund (WEF))
- Case study:Lugton Water Fish Barrier Easement + (Scottish Water Environment Fund (WEF))
- Case study:Short Heath Brook Project + (Section 106 (planning gain) and Environment Agency)
- Case study:Restoration of the river continuity on the Touques Basin + (Ministry of the Environment)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Seine-Normandie Water Agency (50%))
- Case study:Removal of the Ver mill weir on the Sienne River + (Seine-Normandie Water agency (90%))
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Seine-Normandie water agency (80%))
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Regional Council of Burgundy)
- Case study:Shoreham Harbour Shingle Bypassing and Recycling + (Shoreham Port Authority)
- Case study:Silverån övre + (European Union)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Agence de l’eau Rhin-Meuse (50 %))
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Skagerak Kraft AS)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (European Union)
- Case study:Hospital Bridge Road + (Small grant applications)
- Case study:Hills to Levels + (Local Growth Fund)
- Case study:Harbertonford Flood Alleviation Scheme + (Defra)
- Case study:Belton Floodplain Reconnection and River Restoration + (Leader+ European Structural Fund)
- Case study:Exmoor Mires Partnership + (South West Water)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Sport Asistance)
- Case study:Chambers Wharf + (St Martins Property Investments Ltd)
- Case study:Kuuskoski-Fishway + (European Union)
- Case study:Rheinauen bei Rastatt + (European Commission)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (European Union)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Statkraft AS)
- Case study:Restoration of spawning grounds for trout in Bjornesfjorden (Hardangervidda) + (Statkraft AS)