Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:North Norfolk Coast + (Defra)
- Case study:Hesketh Out Marsh Managed Realignment + (Flood Defence Grant-in-Aid)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Defra WFD funded)
- Case study:Broadwater Brook + (National Lottery Heritage Fund)
- Case study:Wilmer Way School Playing Field + (Redevelopment of the surrounding area (106 agreements))
- Case study:Merdian Water development site + (Redevelopment of the surrounding area (106 agreements))
- Case study:Tungelroyse beek + (Regeling Actief Bodembeheer de Kempen paid for most of the pollution clean up)
- Case study:Restoration of the river continuity on the Touques Basin + (Ministry of the Environment)
- Case study:Ecological Restoration of Natural Lake Pochina + (Ministry of Environment and County Council Galati)
- Case study:Ecological Restoration of Vlascuta Lake + (Ministry of Environment and County Council Galati)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Ministry of Environment and County Council Galati)
- Case study:Refilling the meanders of the Colostre + (Water Agency)
- Case study:Removal of five Lakes on the Val des Choues stream + (European Commission)
- Case study:Restoring the River Doquette to its original bed + (Water Agency)
- Case study:Agreed definition of mobility area for the Adour + (Water Agency)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Water Agency)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Water Agency)
- Case study:Off-Channels Restauration + (FEDER)
- Case study:Reopening of the culverted Redon river + (Agence de l’eau (Water Agency) (31%))
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Regional Council of Burgundy)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (Water Agency)
- Case study:Alkborough tidal defence scheme + (Flood Defence Grant-in-Aid)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Regional Directorate for the Environment (DIREN): 20.5%)
- Case study:Restoration of Vakkolankoski Torrent + (Regional ELY-centre)
- Case study:Restoration of Naarkoski Torrent + (SYKE)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (National Fund for compensation of hydropower production (Svenska naturskyddsföreningens Bra miljöval) and owner company of the power plant Triventus AB)
- Case study:Restoration of Vakkolankoski Torrent + (Regional Environment Institute)
- Case study:Restoration of Siuruanjoki River + (Regional Environment Institute)
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River + (LIFE project 464.550€)
- Case study:Restoring the natural dynamics of the upper Adour + (Restoration works: Water agency (50%))
- Case study:Stroud Rural Sustainable Drainage Project + (Regional flood and coastal committee)
- Case study:Valtellina 2005 – New green system + (Regione Lombardia and sediments sellling)
- Case study:Restoration project of riparian buffer of the Sesia river + (Regione Piemonte – Direzione ambiente)
- Case study:LIFE+ Traisen + (VERBUND (15 million euros) and other financing partners: Office of the Lower Austrian Provincial Government Federal Ministry of Agriculture)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (Research council)
- Case study:Broom Road Recreation Ground + (Possible funding - As part of the TLS)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Rhin-Meuse water agency (50%))
- Case study:Removal of five Lakes on the Val des Choues stream + (European Commission)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Rhône-Méditerranée-Corse water agency (60%))
- Case study:Removal of the Brosses weir on the Soanan River + (Rhône-Méditerranée-Corse water agency (60%))
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (ERDF (45%))
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Rhône-Méditerranée-Corse water agency: 47.25%; Champsaur intermunicipal association: 20%; Provence-Alpes-Côte d’Azur region: 14.25%; Hautes-Alpes departmental council: 10%; EU (ERDF): 8.5%)
- Case study:River Calder improvement project + (Ribble Catchment Conservation Trust)
- Case study:Amerongse Bovenpolder + (Rijkswaterstaat)
- Case study:Sandscaping + (Rijkswaterstaat)
- Case study:Stora, Holstebro HEP station + (Danish EPA (3/5))
- Case study:Roe and Ive + (Environment Agency)
- Case study:Sussex Flow Initiative + (Environment Agency)
- Case study:Devon Beaver Project and River Otter Beaver Trail + (Natural England)
- Case study:Nant Barrog + (Rural Development Plan Sustainable Management Scheme)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (Agence de l’eau Rhin-Meuse (AERM) (40 %))
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Agence de l’eau Loire-Bretagne (50 %))