Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Cranford Park Phase 2 + (Flood Risk Management)
- Case study:River Wid restoration scheme + (Flood and Coastal Risk Management)
- Case study:Lustrum Beck Flood Alleviation Scheme: Phase 2 + (Flood and Coastal Risk Management)
- Case study:Evenlode Catchment Project + (Thames RFCC local levy)
- Case study:Poole Bay Beach Replenishment Trial + (Defra)
- Case study:Broom Road Recreation Ground + (Possible funding - As part of the TLS)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Agence de l’eau (35 %))
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Agence de l’eau Rhin-Meuse (AERM) : 60 %)
- Case study:Boosting slivso + (Forest and Nature Agency)
- Case study:Slowing the Flow at Pickering + (Defra)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (Research council)
- Case study:Investigating the impact of floodplain woodland on flood flows in the River Cary catchment, Somerset + (Forestry Commission)
- Case study:Investigating the interaction between semi-natural floodplain woodland and flood flows at Great Triley Wood + (Forestry Commission)
- Case study:Eddleston water + (Scottish Government)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (Ordinary management fund)
- Case study:Eldbäcken + (Fortum Environmental Fund)
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River + (LIFE project 464.550€)
- Case study:Wandsworth Riverside Quarter + (Frasers Property)
- Case study:Isar-Plan + (City of Munich)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (French Ministry of Industry)
- Case study:Removal of five Lakes on the Val des Choues stream + (European Commission)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (French State)
- Case study:Agreed definition of mobility area for the Adour + (Water Agency)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Loire-Bretagne Water agency 30%)
- Case study:Moreton Channel Gravel Reprofiling + (Environment Agency)
- Case study:Stanmore Marsh + (Funded from GLA Big Green Fund II)
- Case study:Elmbridge Meadows + (Funding source unknown)
- Case study:Restoring the River Doquette to its original bed + (Water Agency)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Agence de l’eau Loire-Bretagne (40 %))
- Case study:The Babina Restoration Project + (GEF biodiversity preservation project in the Danube Delta)
- Case study:The Cernovca Restoration Project + (GEF biodiversity preservation project in the Danube Delta)
- Case study:The Fortuna Restoration Project + (GEF – BM Programe)
- Case study:Enhancements in Hampstead Heath + (GLA)
- Case study:Rewilding Enfield's Urban Rivers + (Defra)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (LIFE project 291.342€)
- Case study:Devon Beaver Project and River Otter Beaver Trail + (Natural England)
- Case study:Reopening of the culverted Redon river + (Agence de l’eau (Water Agency) (31%))
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Seine-Normandie Water Agency (50%))
- Case study:Restoration of the Charentonne in the Serquigny public garden + (General Council of the Eure)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Water Agency)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (Federal state of Schleswig-Holstein)
- Case study:Vallacuera Ravine. Removal of a dyke + (Government of Navarra)
- Case study:Restoration of riparian zone in Aragon River + (Government of Navarra)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Global Environment Facility (GEF))
- Case study:Castle Irwell Urban Wetland + (Environment Agency Grant in Aid)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (ASAJA)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (ACA)
- Case study:Bidasoa Dam removal 2 + (EU LIFE Programme)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (Ordinary management fund)
- Case study:Beverley Brook d/s of Rock’s Lane + (Environment Agency)
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (ACA)