Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Belford Natural Flood Management Scheme, Northumberland + (Local levy funding)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (Norwegian Environment Agency)
- Case study:Wummewiesen restoration project + (Ministry of the Environment in Bremen)
- Case study:Vindel River LIFE + (European Commission)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (County Administrative Board of Västra Götaland)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (Federal state of Schleswig-Holstein)
- Case study:Restoration of Longinoja brook + (Finnish Environment Institute)
- Case study:Alkborough tidal defence scheme + (Flood Defence Grant-in-Aid)
- Case study:Medmerry Managed Realignment Scheme + (Flood Defence Grant-in-Aid)
- Case study:Humber Estuary Erosion Protection Programme + (Flood Defence Grant-in-Aid)
- Case study:North Norfolk Coast + (Defra)
- Case study:Hesketh Out Marsh Managed Realignment + (Flood Defence Grant-in-Aid)
- Case study:Fingringhoe Managed Realignment + (Essex Wildlife Trust)
- Case study:Rye Harbour Farm Regulated Tidal Exchange + (Flood Defence Grant-in-Aid)
- Case study:Sandwich Tidal Defence Scheme + (Flood Defence Grant-in-Aid)
- Case study:Waldringfield Flood Defence Scheme, Suffolk + (Coastal Communities Fund)
- Case study:Pagham Harbour Bypassing + (Flood Defence Grant-in-Aid)
- Case study:Cranford Park Phase 2 + (Flood Risk Management)
- Case study:River Wid restoration scheme + (Flood and Coastal Risk Management)
- Case study:Lustrum Beck Flood Alleviation Scheme: Phase 2 + (Flood and Coastal Risk Management)
- Case study:Evenlode Catchment Project + (Thames RFCC local levy)
- Case study:Poole Bay Beach Replenishment Trial + (Defra)
- Case study:Broom Road Recreation Ground + (Possible funding - As part of the TLS)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Agence de l’eau (35 %))
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Agence de l’eau Rhin-Meuse (AERM) : 60 %)
- Case study:Eddleston water + (Forest Carbon)
- Case study:Boosting slivso + (Forest and Nature Agency)
- Case study:Slowing the Flow at Pickering + (Defra)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (Research council)
- Case study:Investigating the impact of floodplain woodland on flood flows in the River Cary catchment, Somerset + (Forestry Commission)
- Case study:Investigating the interaction between semi-natural floodplain woodland and flood flows at Great Triley Wood + (Forestry Commission)
- Case study:Eddleston water + (Scottish Government)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (Ordinary management fund)
- Case study:Eldbäcken + (Fortum Environmental Fund)
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River + (LIFE project 464.550€)
- Case study:Wandsworth Riverside Quarter + (Frasers Property)
- Case study:Isar-Plan + (City of Munich)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (French Ministry of Industry)
- Case study:Removal of five Lakes on the Val des Choues stream + (European Commission)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (French State)
- Case study:Agreed definition of mobility area for the Adour + (Water Agency)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Loire-Bretagne Water agency 30%)
- Case study:Moreton Channel Gravel Reprofiling + (Environment Agency)
- Case study:Stanmore Marsh + (Funded from GLA Big Green Fund II)
- Case study:Elmbridge Meadows + (Funding source unknown)
- Case study:Restoring the River Doquette to its original bed + (Water Agency)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Agence de l’eau Loire-Bretagne (40 %))
- Case study:The Babina Restoration Project + (GEF biodiversity preservation project in the Danube Delta)
- Case study:The Cernovca Restoration Project + (GEF biodiversity preservation project in the Danube Delta)
- Case study:The Fortuna Restoration Project + (GEF – BM Programe)
- Case study:Enhancements in Hampstead Heath + (GLA)