Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (European Union)
- Case study:Rehabilitation of Benta stream + (Operational Program of New Hungary Development Plan)
- Case study:Kuuskoski-Fishway + (European Union)
- Case study:LIFE08NAT/IT/000352 CRAINat + (European Union)
- Case study:Restoration of the lowland river system Grote Nete + (European Union)
- Case study:Removal of the Fatou dam on the Beaume river + (Etablissement public de Loire)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (European Union)
- Case study:Marsh protection in Egyek–Pusztakócs + (European Union)
- Case study:Restoration of the river continuity on the Touques Basin + (Ministry of the Environment)
- Case study:Guisborough Flood Alleviation Scheme + (Environment Agency Grant in Aid)
- Case study:Stony Stratford Sluices Bypass Channel + (FCRM GiA)
- Case study:Queensbury Rec + (FDGiA and Harrow Drainage Capital)
- Case study:Restoration of the marsh "Gallega" + (FEDER)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (FEDER)
- Case study:Restoration of the stream of the Partido + (FEDER)
- Case study:Recovery of the functionality of Brazo de la Torre + (FEDER)
- Case study:Recovery "CañoTravieso" + (FEDER)
- Case study:Off-Channels Restauration + (FEDER)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Agence de l’eau (30 %))
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (AESN (51 %))
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Agence de l’eau Artois-Picardie (AEAP) (50 %))
- Case study:ReNaturalize + (FINEP)
- Case study:Mill Road Weir + (FRM Capital Budget)
- Case study:Poyle channel enhancement and weir removal + (FRM capital works)
- Case study:Belford Natural Flood Management Scheme, Northumberland + (Local levy funding)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (Fana stein og gjenvinning AS)
- Case study:Wummewiesen restoration project + (Ministry of the Environment in Bremen)
- Case study:Vindel River LIFE + (European Commission)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (County Administrative Board of Västra Götaland)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (Federal state of Schleswig-Holstein)
- Case study:Restoration of Longinoja brook + (Finnish Environment Institute)
- Case study:Alkborough tidal defence scheme + (Flood Defence Grant-in-Aid)
- Case study:Medmerry Managed Realignment Scheme + (Flood Defence Grant-in-Aid)
- Case study:Humber Estuary Erosion Protection Programme + (Flood Defence Grant-in-Aid)
- Case study:North Norfolk Coast + (Defra)
- Case study:Hesketh Out Marsh Managed Realignment + (Flood Defence Grant-in-Aid)
- Case study:Fingringhoe Managed Realignment + (Essex Wildlife Trust)
- Case study:Rye Harbour Farm Regulated Tidal Exchange + (Flood Defence Grant-in-Aid)
- Case study:Sandwich Tidal Defence Scheme + (Flood Defence Grant-in-Aid)
- Case study:Waldringfield Flood Defence Scheme, Suffolk + (Coastal Communities Fund)
- Case study:Pagham Harbour Bypassing + (Flood Defence Grant-in-Aid)
- Case study:Cranford Park Phase 2 + (Flood Risk Management)
- Case study:River Wid restoration scheme + (Flood and Coastal Risk Management)
- Case study:Lustrum Beck Flood Alleviation Scheme: Phase 2 + (Flood and Coastal Risk Management)
- Case study:Evenlode Catchment Project + (Thames RFCC local levy)
- Case study:Poole Bay Beach Replenishment Trial + (Defra)
- Case study:Broom Road Recreation Ground + (Possible funding - As part of the TLS)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Agence de l’eau (35 %))
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Agence de l’eau Rhin-Meuse (AERM) : 60 %)
- Case study:Eddleston water + (Scottish Government)
- Case study:Boosting slivso + (Forest and Nature Agency)