Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Environmental Department)
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River + (LIFE project 464.550€)
- Case study:Rewilding the Rom + (Essex & Suffolk Water)
- Case study:Fingringhoe Managed Realignment + (Essex Wildlife Trust)
- Case study:Removal of the Fatou dam on the Beaume river + (Etablissement public de Loire)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Eu contribution (LIFE PROGRAMME))
- Case study:LIFE RISORGIVE – Fontane Marzare + (Eu contribution (LIFE PROGRAMME))
- Case study:LIFE RISORGIVE – Roggia Girosa + (Eu contribution (LIFE PROGRAMME))
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Eu contribution (LIFE PROGRAMME))
- Case study:Removal of five Lakes on the Val des Choues stream + (European Commission)
- Case study:Vindel River LIFE + (European Commission)
- Case study:River Avon Stream project + (European Commission)
- Case study:Rheinauen bei Rastatt + (European Commission)
- Case study:Loutre BeLu: Restoration of European otter habitats (Belgium & Luxemburg) + (European Commission)
- Case study:Beddington Park + (Viridor funding)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (Research council)
- Case study:River restoration: Benefits for integrated catchment management + (European Commission (LIFE 30%))
- Case study:Removal of the Kernansquillec dam over the River Léguer + (French Ministry of Industry)
- Case study:Improvement of the River Varde at the Wadden Sea estuary + (European Community)
- Case study:Rinya water-system reconstruction +
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva +
- Case study:Restoration of Naarkoski Torrent + (SYKE)
- Case study:Restoration of Enningdalsälv River + (European Regional Development Fund)
- Case study:Restoration of Siuruanjoki River + (European Regional Development Fund)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (European Regional Development Fund)
- Case study:Dagenham Washlands Phase 2 + (European Regional Development Fund)
- Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 + (European Regional Development Fund)
- Case study:Beam washlands + (Environment Agency)
- Case study:Lower Otter Restoration Project + (Environment Agency)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Seine-Normandie Water Agency (50%))
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Artois-Picardie water agency (51%))
- Case study:Silverån övre + (European Union)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (European Union)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (European Union)
- Case study:Rinya water-system reconstruction + (European Union)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (European Union)
- Case study:Rehabilitation of Benta stream + (European Union)
- Case study:Kuuskoski-Fishway + (European Union)
- Case study:LIFE08NAT/IT/000352 CRAINat + (European Union)
- Case study:Restoration of the lowland river system Grote Nete + (European Union)
- Case study:Removal of the Fatou dam on the Beaume river + (European Union)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (European Union)
- Case study:Marsh protection in Egyek–Pusztakócs + (European Union)
- Case study:Restoration of the river continuity on the Touques Basin + (Ministry of the Environment)
- Case study:Guisborough Flood Alleviation Scheme + (Environment Agency Grant in Aid)
- Case study:ReNaturalize + (FINEP)
- Case study:Stony Stratford Sluices Bypass Channel + (FCRM GiA)
- Case study:Queensbury Rec + (FDGiA and Harrow Drainage Capital)
- Case study:Restoration of the marsh "Gallega" + (FEDER)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (FEDER)
- Case study:Restoration of the stream of the Partido + (FEDER)
- Case study:Recovery of the functionality of Brazo de la Torre + (FEDER)
- Case study:Recovery "CañoTravieso" + (FEDER)
- Case study:Off-Channels Restauration + (FEDER)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Agence de l’eau (30 %))
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (AESN (51 %))
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Agence de l’eau Artois-Picardie (AEAP) (50 %))
- Case study:Mill Road Weir + (FRM Capital Budget)
- Case study:Poyle channel enhancement and weir removal + (FRM capital works)
- Case study:Belford Natural Flood Management Scheme, Northumberland + (Local levy funding)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (Norwegian Environment Agency)
- Case study:Wummewiesen restoration project + (Ministry of the Environment in Bremen)