Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Reopening of the culverted Redon river + (Agence de l’eau (Water Agency) (31%))
- Case study:Effacement du seuil de Carayon sur le Thoré + (État (40 %))
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (Agence de l’eau Artois-Picardie (39%))
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Agence de l’eau Artois-Picardie (50 %))
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Agence de l’eau Artois-Picardie (80 %))
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Agence de l’eau Artois-Picardie (AEAP) (50 %))
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Agence de l’eau Loire-Bretagne (40 %))
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Agence de l’eau Loire-Bretagne (50 %)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Agence de l’eau Loire-Bretagne (50 %))
- Case study:Rétablissement de la continuité écologique sur la Luire + (Agence de l’eau Loire-Bretagne (50 %))
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Agence de l’eau Loire-Bretagne (AELB) 40 % ; FEDER 23)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Agence de l’eau Rhin-Meuse (50 %))
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Agence de l’eau Rhin-Meuse (60%))
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (Agence de l’eau Rhin-Meuse (AERM) (40 %))
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Agence de l’eau Rhin-Meuse (AERM) : 60 %)
- Case study:Abaissement et démantèlement de trois clapets sur l’Orge aval + (Conseil régional Île-de-France (40 %))
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Conseil général (30 %))
- Case study:Restoration of the Charentonne in the Serquigny public garden + (General Council of the Eure)
- Case study:Odder Stream Restoration + (Danish Ministry of Food)
- Case study:Fluvial improvement in Riera de Caldés + (Ajuntament de Palau-Solità i Plegamans)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (European Union)
- Case study:Tungelroyse beek + (Regeling Actief Bodembeheer de Kempen paid for most of the pollution clean up)
- Case study:Enhancement of the River Crouch following a pollution incident + (Anglian Water)
- Case study:Stainby Road, Colsterworth + (EA)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Artois-Picardie water agency (51%))
- Case study:The Upper Raba River Spawning Grounds + (Swiss Contribution to the Enlarged European Union)
- Case study:Rheinauen bei Rastatt + (European Commission)
- Case study:Regelsbrunner Aue + (WWF Austria)
- Case study:Sowe Valley Project + (Natural England)
- Case study:Springfield Marina + (LVRPA)
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (ACA)
- Case study:Restoration of the river Børselva + (Ballangen Energi AS)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Ballymoney Council; DCAL Inland Fisheries (NASCO money); DARD Rivers)
- Case study:Arborfield nature like bypass and weirs project + (Defra)
- Case study:Goresbrook and Ship and Shovel Sewer + (Barking Riverside Ltd Section 106 agreement)
- Case study:Removal of the Ver mill weir on the Sienne River + (Seine-Normandie Water agency (90%))
- Case study:Tungelroyse beek + (Regeling Actief Bodembeheer de Kempen paid for most of the pollution clean up)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (Norwegian Environment Agency)
- Case study:Crane Park + (Biffaward secured)
- Case study:Yeading Brook Fields/Meadows + (Biffaward secured)
- Case study:Roxbourne Park + (Biffaward secured)
- Case study:Yeading Brook fields - Reedbed creation + (Biffaward secured)
- Case study:Chinbrook Meadows Wetlands + (Environment Agency)
- Case study:Poole Bay Beach Replenishment Trial + (Defra)
- Case study:Old Station Beat restoration, River Test at Bossington + (Environment Agency)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Loire-Bretagne Water agency 30%)
- Case study:Lea Bridge Waterway Wall Improvements + (British Waterways major works programme)
- Case study:March Burn at Riding Mill + (Defra)
- Case study:Eddleston water + (Scottish Government)
- Case study:Habitat measures Hollundbekken + (Bømlo municipality)