- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (Syndicat Mixte d’aménagement du Val de Clouère)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Office National de Forêts)
- Case study:Removal of five Lakes on the Val des Choues stream + (Office National de Forêts)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (e Fédération départementale du Pas-de-Calais pour la pêche et la protection du milieu aquatique)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Parc naturel régional du Morvan)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Syndicat intercommunal de la vallée de la Blaise (SIVB))
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Association agréée pour la pêche et la protection du milieu aquatique (AAPPMA) de Lautrec)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Office national de l’eau et des milieux aquatiques)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (Office national de l’eau et des milieux aquatiques)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (PNR Golfe du Morbihan)
- Case study:Abaissement et démantèlement de trois clapets sur l’Orge aval + (Syndicat de l’Orge)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Syndicat du bassin du Vicoin)
- Case study:Mulkear Life Project + (Inland Fisheries Ireland)
- Case study:The Environmental River Enhancement Programme + (Office of Public Works (Ireland))
- Case study:Lower River Roding Regeneration Project + (Environment Agency)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-2015 + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (freiland Environmental Consulting Civil Engineers Ltd.)
- Case study:Weir demolition in river Nansa, Cantabria + (Oficina regional de Comisaría de Aguas y Dirección Técnica, C.H. Cantábrico)
- Case study:London Olympics Parklands + (Atkins, Olympic Development Authority)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (Onema)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Onema)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Onema)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Onema)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Onema)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Onema)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Onema)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Onema)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Onema)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Onema)
- Case study:Restoration of side channels of the Loire and its tributaries + (DREAL + FDPPMA, local AAPPMAs, river associations)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Syndicat mixte du bassin de l’Agout (SMBA))
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Onema-Delegation Interregional Centre - Poitou - Charentes)
- Case study:Restoration of the river Akerselva + (Oslo municipality)
- Case study:Reopening and restoration of the stream Hovinbekken + (Oslo municipality)
- Case study:Teglverksdammen + (Oslo municipality)
- Case study:Broadwater Brook + (Ouse & Adur Rivers Trust)
- Case study:Spring Meadow Meander Restoration + (Ouse and Adur Rivers Trust)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Environment Agency)
- Case study:Western Rother Fishery Habitat Enhancement + (Ouse and Adur Rivers Trust)
- Case study:River Adur - Shipley weir removal + (Environment Agency)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Royal HaskoningDHV)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Ouse and Adur Rivers Trust)
- Case study:East Mascalls Fish Pass + (Ouse and Adur Rivers Trust)
- Case study:Hull and East Riding Catchment Partnership + (Hull and East Riding Catchment Partnership)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (Irwell Rivers Trust)
- Case study:Upper Welland Water Friendly Farming Project + (Game & Wildlife Conservation Trust)
- Case study:River Thame Catchment Conservation Project + (The Freshwater Water Habitats Trust)
- Case study:Longbridge West + (PJA)
- Case study:Welton Farm Landfill/Riverbank Works + (PKC)