Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Longstreet A 91a + (Lowering of impoundment)
- Case study:Ladywell Fields to Cornmill Gardens + (Creation of meanders)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:River Witham Great Ponton + (Weir Bypass)
- Case study:Upper Witham Restoration + (Weir Bypass and removal)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretches)
- Case study:Kirkstone Beck River Restoration + (Widening to allow wandering sections)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (Works to safeguard the bridge)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (allowing hydromorphological diversification upstream in the previously impounded stretch)
- Case study:Charlton St Peter A 8 + (Channel narrowing)
- Case study:Stainby Road, Colsterworth + (In-set floodplains created)
- Case study:SHerston River IMProvement (SHRIMP) Project + (Introducing large woody debris)
- Case study:Watercress Farm Rewetting Project + (Creating a new river channel demanded specialised insight and expert execution. Ecosulis)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Ensuring an additional contribution to l’A … Ensuring an additional contribution to l’Albufera of water from the Júcar-Túria system through rapid flushing technical discharges; Increase the proportion of water inputs to l’Albufera from rivers with respect to the water inputs from sewage and treatments plants; Preserve contributions from Xúquerplants; Preserve contributions from Xúquer)
- Case study:Goldrill Beck River Restoration + (re-meandering)
- Case study:River Valency at Boscastle + (embayments and cascades created)
- Case study:Hills to Levels + (Opening long sections of culverts)
- Case study:Slowing the Flow at Pickering + (leaky woody dams)
- Case study:The Bowmont Catchment + (leaky woody dams)
- Case study:Devon Beaver Project and River Otter Beaver Trail + (leaky woody dams)
- Case study:Belford Natural Flood Management Scheme, Northumberland + (leaky woody dams)
- Case study:Blackbrook Slow the Flow, St Helens + (leaky woody dams)
- Case study:Tutta Beck + (leaky woody dams)
- Case study:Lowdham NFM + (leaky woody dams)
- Case study:Glenbrook Wetlands + (n/a)
- Case study:River Witham Great Ponton + (Weir Bypass)
- Case study:France Farm (Phase 1) A 9 + (opening up of hatches to reconnect reaches of the river)
- Case study:Rother meander reconnection + (Re-instatement of old course)
- Case study:Goldrill Beck River Restoration + (re-meandering)
- Case study:Chambers Wharf + (removal of jetty)
- Case study:Millfield Plantation 2 + (Introducing large woody debris)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Development of a flow control structure)