Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Community Wetlands + (Reedbed creation)
- Case study:Wildling the Tame + (Channel widening)
- Case study:Vallacuera Ravine. Removal of a dyke + (Removal of a dyke)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (Channel narrowing)
- Case study:MisbourneRiverAction + (Improvement of channel morphology)
- Case study:Crane Meadows Meander Connections + (Removal of channel blockages)
- Case study:Upper Emscher + (Removal of concrete bank protection)
- Case study:LIFE Saramugo + (Removal of exotic fish species)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Removal of fords)
- Case study:Removal of five Lakes on the Val des Choues stream + (Removal of impoundments)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Removal of impoundments)
- Case study:Letting the Dove Flow 2 + (Channel naturalisation)
- Case study:Lodge Burn Flood Alleviation Scheme + (Removal of pond to restore natural course and sediment transport.)
- Case study:Refilling the meanders of the Colostre + (Removal of poplars in old meanders)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (Creation of new channel)
- Case study:Babingley River at Hillington + (Channel narrowing)
- Case study:Restoration project in Verde River + (Removal of speckles)
- Case study:Guadiamar Green Corridor Project + (Remove drains and pipes)
- Case study:River restoration project in Sella, Asturias + (Remove obstacles in the riverbed)
- Case study:Llobregat river restoration + (Remove obstacles in the riverbed)
- Case study:Restoring connectivity of the ecological corridor in the Biała River valley + (Removing barriers to water organisms migration in the river)
- Case study:The River Deerness Project + (Remove obstacles in the riverbed)
- Case study:Colne Water Restoration Project + (Removing barriers to water organisms migration in the river)
- Case study:River Slea Rehabilitation + (Creation of meanders)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:Beneden-Leeuwen-Side channel + (Side channel created)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Topographic and landscape restoration)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Topographic and landscape restoration)
- Case study:Longstreet A 91a + (Lowering of impoundment)
- Case study:Ladywell Fields to Cornmill Gardens + (Creation of meanders)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Ensuring an additional contribution to l’A … Ensuring an additional contribution to l’Albufera of water from the Júcar-Túria system through rapid flushing technical discharges; Increase the proportion of water inputs to l’Albufera from rivers with respect to the water inputs from sewage and treatments plants; Preserve contributions from Xúquerplants; Preserve contributions from Xúquer)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:River Witham Great Ponton + (Weir Bypass)
- Case study:Upper Witham Restoration + (Weir Bypass and removal)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretches)
- Case study:Kirkstone Beck River Restoration + (Widening to allow wandering sections)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (Works to safeguard the bridge)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (allowing hydromorphological diversification upstream in the previously impounded stretch)
- Case study:Charlton St Peter A 8 + (Channel narrowing)
- Case study:Watercress Farm Rewetting Project + (Creating a new river channel demanded specialised insight and expert execution. Ecosulis)
- Case study:Stainby Road, Colsterworth + (In-set floodplains created)
- Case study:SHerston River IMProvement (SHRIMP) Project + (Introducing large woody debris)
- Case study:Goldrill Beck River Restoration + (re-meandering)
- Case study:River Valency at Boscastle + (Change in bed profile)
- Case study:Hills to Levels + (Opening long sections of culverts)
- Case study:Slowing the Flow at Pickering + (leaky woody dams)
- Case study:The Bowmont Catchment + (leaky woody dams)
- Case study:Devon Beaver Project and River Otter Beaver Trail + (leaky woody dams)
- Case study:Belford Natural Flood Management Scheme, Northumberland + (leaky woody dams)
- Case study:Blackbrook Slow the Flow, St Helens + (leaky woody dams)
- Case study:Tutta Beck + (leaky woody dams)