Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Lower Woodsford + (Re-profiled ditch)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Re-profiled ditch)
- Case study:The Babina Restoration Project + (Reconnecting polder)
- Case study:The Cernovca Restoration Project + (Reconnecting polder)
- Case study:The Fortuna Restoration Project + (Reconnecting polder)
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Reconnection of cutoff meander)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (Re-meandering)
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (Reconnection of cutoff meander)
- Case study:River Little Ouse at Thetford + (Reconnection of cutoff meander)
- Case study:Welland for People and Wildlife Project + (Meandering channel)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Reconnection of cutoff meander)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Creation of meanders)
- Case study:Morava restoration project + (Reconnection of river channels)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Reconnection of water bodies to the river)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Reconnection of water bodies to the river)
- Case study:Mayesbrook Climate Change Park restoration project + (Improvement of channel morphology)
- Case study:Barnes Common improvements + (Reedbed creation)
- Case study:Beddington Park Enhancements + (Channel narrowing)
- Case study:Longford Community Nature Park Reedbed Restoration Project + (Reedbed creation)
- Case study:Community Wetlands + (Reedbed creation)
- Case study:Wildling the Tame + (Channel widening)
- Case study:Vallacuera Ravine. Removal of a dyke + (Removal of a dyke)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (Channel narrowing)
- Case study:MisbourneRiverAction + (Improvement of channel morphology)
- Case study:Crane Meadows Meander Connections + (Removal of channel blockages)
- Case study:Upper Emscher + (Removal of concrete bank protection)
- Case study:Removal of five Lakes on the Val des Choues stream + (Removal of impoundments)
- Case study:LIFE Saramugo + (Removal of exotic fish species)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Removal of fords)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Removal of impoundments)
- Case study:Letting the Dove Flow 2 + (Channel naturalisation)
- Case study:Lodge Burn Flood Alleviation Scheme + (Removal of pond to restore natural course and sediment transport.)
- Case study:Refilling the meanders of the Colostre + (Removal of poplars in old meanders)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (Creation of new channel)
- Case study:Babingley River at Hillington + (Channel narrowing)
- Case study:Restoration project in Verde River + (Removal of speckles)
- Case study:Guadiamar Green Corridor Project + (Remove drains and pipes)
- Case study:River restoration project in Sella, Asturias + (Remove obstacles in the riverbed)
- Case study:Llobregat river restoration + (Remove obstacles in the riverbed)
- Case study:The River Deerness Project + (Remove obstacles in the riverbed)
- Case study:Restoring connectivity of the ecological corridor in the Biała River valley + (Removing barriers to water organisms migration in the river)
- Case study:Colne Water Restoration Project + (Removing barriers to water organisms migration in the river)
- Case study:River Slea Rehabilitation + (Creation of meanders)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:Beneden-Leeuwen-Side channel + (Side channel created)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Topographic and landscape restoration)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Topographic and landscape restoration)
- Case study:Longstreet A 91a + (Lowering of impoundment)
- Case study:Ladywell Fields to Cornmill Gardens + (Creation of meanders)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Ensuring an additional contribution to l’A … Ensuring an additional contribution to l’Albufera of water from the Júcar-Túria system through rapid flushing technical discharges; Increase the proportion of water inputs to l’Albufera from rivers with respect to the water inputs from sewage and treatments plants; Preserve contributions from Xúquerplants; Preserve contributions from Xúquer)
- Case study:River Witham Great Ponton + (Weir Bypass)