- Case study:Inchewan Burn Bed restoration + (In-channel placement of boulders to provide flow diversity)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (In-channel placement of boulders to provide flow diversity)
- Case study:Stainby Road, Colsterworth + (In-set floodplains created)
- Case study:Ouzel habitat improvement + (Increase in-channel hydromorphological diversity)
- Case study:Adams Mill enhancements + (Increase in-channel hydromorphological diversity)
- Case study:Norman Park Bromley. + (Deculverting)
- Case study:Wandle River Restoration Project: Hackbridge + (Increase in-channel hydromorphological diversity)
- Case study:Vreugderijkerwaard side channel + (Increase river dynamics)
- Case study:River Calder Large Wood Structure installation + (Installation of Large Wood Structures)
- Case study:Restoration of Longinoja brook + (Introducing large woody debris)
- Case study:Wild Wylye Phase 1 + (Channel realignment)
- Case study:Seven Hatches + (Channel narrowing)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Introducing large woody debris)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Re-meandering)
- Case study:Charlton St Peter A 8 + (Channel narrowing)
- Case study:Longstreet A 91a + (Lowering of impoundment)
- Case study:River Tat Restoration Scheme + (Introducing large woody debris)
- Case study:Tarrant Monkton Rehabilitation Project + (Flow deflectors)
- Case study:Martins River Island + (Introducing large woody debris)
- Case study:Millfield Plantation 2 + (Introducing large woody debris)
- Case study:Eastridge Estate restoration project + (Channel narrowing)
- Case study:Bathgate Watercourse Restoration Project + (Re-meandering)
- Case study:River Idle Restoration Project + (Introducing large woody debris)
- Case study:ReNaturalize + (Introducing large woody debris)
- Case study:Wellow Brook Habitat Enhancement Project + (Introducing large woody debris)
- Case study:SHerston River IMProvement (SHRIMP) Project + (Introducing large woody debris)
- Case study:West End Brook - weir removal and track management + (Introducing large woody debris)
- Case study:Bringing Back the Bulbourne + (Introducing large woody debris)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Introducing large woody debris)
- Case study:River Wensum Restoration, Reach 10 Lenwade + (Brushwood berms to increase scour on the gravels)
- Case study:The South Cornwall River Improvement Project - River Par + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project - St. Austell + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project - Mevagissey River + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project – Warleggan + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project – Crinnis + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project – Polmear stream + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project – Gorran Stream + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project – Portmellon Stream + (Introduction of gravel)
- Case study:The South Cornwall River Improvement Project – Bokiddicks Stream + (Introduction of gravel)
- Case study:Martins River Island + (Introduction of gravel)
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (Creation of fish refuge areas)
- Case study:Doñana 2005 + (Landscape improvement of the area of the spill)
- Case study:Ems floodplain + (Lengthening of channel)
- Case study:Longstreet A 91a + (Lowering of impoundment)
- Case study:Gategill Beck: Abandoned Metal Mines + (Lowering of impoundment)
- Case study:Sutcliffe Park + (Creation of new channel)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Channel naturalisation)
- Case study:Voorste Nete at Dessel + (Channel naturalisation)
- Case study:Eddleston water + (Meandering channel)
- Case study:River Gelsa at Bevtoft + (Channel naturalisation)
- Case study:River Somer channel enhancement, Midsomer Norton + (Channel naturalisation)
- Case study:Scolo Desolino restoration project + (Channel naturalisation)
- Case study:Rio Sant'Ambrogio restoration project + (Channel naturalisation)
- Case study:Borova Stream and its Revitalisation + (Meandering channel)
- Case study:Welland for People and Wildlife Project + (Meandering channel)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Diversification of in-channel features)
- Flood detention basin (HRB) Ickern-Mengede + (Channel naturalisation)
- Case study:Spring Meadow Meander Restoration + (Improvement of channel morphology)
- Case study:Platt Brook Restoration + (Meandering channel)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Creation of fish passes)