Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Knepp Rewilding Project + (Channel realignment)
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (Creation of fish refuge areas)
- Case study:Gunville Phase I + (Enhancing flow diversity)
- Case study:Taming the Tame + (Habitat creation)
- Case study:River Glaven, North Norfolk + (Habitat restoration)
- Case study:Cornmill Gardens (QUERCUS) + (Improvement of channel morphology)
- Case study:QUERCUS Ravensbourne + (Improvement of channel morphology)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Protection and correction of incision problems)
- Case study:Restoration of the marsh "Gallega" + (Improvement of channel morphology)
- Case study:Restoration of the stream of the Partido + (Improvement of channel morphology)
- Case study:Recovery "CañoTravieso" + (Modification or removal of existing defenses)
- Case study:Mayesbrook Climate Change Park restoration project + (Improvement of channel morphology)
- Case study:River Wandle Restoration Project + (Assessment and monitoring program)
- Case study:The South Hams River Improvement Project (SHRImP) + (Improvement of channel morphology)
- Flood detention basin (HRB) Ickern-Mengede + (Channel naturalisation)
- Case study:Spring Meadow Meander Restoration + (Improvement of channel morphology)
- Case study:South Calder Water deculverting and habitat restoration + (Improvement of channel morphology)
- Case study:River Gaywood – Seven Sisters Drain + (Improvement of channel morphology)
- Case study:MisbourneRiverAction + (Improvement of channel morphology)
- Case study:Letting the Dove Flow 2 + (Channel naturalisation)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:West Amesbury + (Re-meandering)
- Case study:Arborfield nature like bypass and weirs project + (Improving fish migration)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Improving fish migration)
- Case study:River Wandle: Butter Hill Phase 3 + (Improving fish migration)
- Case study:Tichborne River Restoration Project + (Improving fish migration)
- Case study:Kelham Island Weir Fish Easement + (Improving fish migration)
- Case study:Inchewan Burn Bed restoration + (In-channel placement of boulders to provide flow diversity)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (In-channel placement of boulders to provide flow diversity)
- Case study:Stainby Road, Colsterworth + (In-set floodplains created)
- Case study:Ouzel habitat improvement + (Increase in-channel hydromorphological diversity)
- Case study:Adams Mill enhancements + (Increase in-channel hydromorphological diversity)
- Case study:Norman Park Bromley. + (Deculverting)
- Case study:Wandle River Restoration Project: Hackbridge + (Increase in-channel hydromorphological diversity)
- Case study:Vreugderijkerwaard side channel + (Increase river dynamics)
- Case study:River Calder Large Wood Structure installation + (Installation of Large Wood Structures)
- Case study:Restoration of Longinoja brook + (Introducing large woody debris)
- Case study:Wild Wylye Phase 1 + (Channel realignment)
- Case study:Seven Hatches + (Channel narrowing)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Introducing large woody debris)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Re-meandering)
- Case study:Charlton St Peter A 8 + (Channel narrowing)
- Case study:Longstreet A 91a + (Lowering of impoundment)
- Case study:River Tat Restoration Scheme + (Introducing large woody debris)
- Case study:Tarrant Monkton Rehabilitation Project + (Flow deflectors)
- Case study:Martins River Island + (Introducing large woody debris)
- Case study:Millfield Plantation 2 + (Introducing large woody debris)
- Case study:Eastridge Estate restoration project + (Channel narrowing)
- Case study:Bathgate Watercourse Restoration Project + (Re-meandering)
- Case study:River Idle Restoration Project + (Introducing large woody debris)