Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Diversification of in-channel features)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (Diversification of in-channel features)
- Case study:Merton Abbey Mills Eel Pass + (Eel pass installation)
- Flood detention basin (HRB) Ickern-Mengede + (Channel naturalisation)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Re-meandering)
- Case study:Knepp Rewilding Project + (Channel realignment)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Adding sinuosity)
- Case study:River Wandle: Butter Hill Phase 3 + (Enhancing flow diversity)
- Case study:Gunville Phase I + (Enhancing flow diversity)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Ensuring an additional contribution to l’A … Ensuring an additional contribution to l’Albufera of water from the Júcar-Túria system through rapid flushing technical discharges; Increase the proportion of water inputs to l’Albufera from rivers with respect to the water inputs from sewage and treatments plants; Preserve contributions from Xúquerplants; Preserve contributions from Xúquer)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Eradication of Rana Bedriagae)
- Case study:Charlton St Peter A 8 + (Channel narrowing)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Flooding of small islands)
- Case study:Wild Wylye Phase 1 + (Channel realignment)
- Case study:Barnes Common improvements + (Reedbed creation)
- Case study:Tarrant Monkton Rehabilitation Project + (Flow deflectors)
- Case study:River Tarrant Rehabilitation Project + (Flow deflectors)
- Case study:River Tutt Restoration Project + (Flow deflectors)
- Case study:Pow Burn Restoration Project + (Flow deflectors)
- Case study:Lippeaue Klostermersch + (Former channel filled)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:Kimpton Park + (Creation of new channel)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (Channel widening)
- Case study:Wellow Brook Habitat Enhancement Project + (Introducing large woody debris)
- Case study:SHerston River IMProvement (SHRIMP) Project + (Introducing large woody debris)
- Case study:West End Brook - weir removal and track management + (Introducing large woody debris)
- Case study:Taming the Tame + (Habitat creation)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Upper Cringle Floodplain Restoration Project + (Back channel created)
- Case study:Restoration of the marsh "Gallega" + (Habitat restoration)
- Case study:South Calder Water deculverting and habitat restoration + (Habitat restoration)
- Case study:Ironbridge Farm + (Habitat restoration)
- Case study:Knepp Rewilding Project + (Habitat restoration)
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (Habitat restoration)
- Case study:Gunville Phase I + (Habitat restoration)
- Case study:Taming the Tame + (Habitat restoration)
- Case study:River Glaven, North Norfolk + (Habitat restoration)
- Case study:Broadwater Brook + (Habitat restoration)
- Case study:Cornmill Gardens (QUERCUS) + (Improvement of channel morphology)
- Case study:QUERCUS Ravensbourne + (Improvement of channel morphology)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Protection and correction of incision problems)
- Case study:Restoration of the marsh "Gallega" + (Improvement of channel morphology)
- Case study:Restoration of the stream of the Partido + (Improvement of channel morphology)
- Case study:Recovery "CañoTravieso" + (Modification or removal of existing defenses)
- Case study:Mayesbrook Climate Change Park restoration project + (Improvement of channel morphology)
- Case study:River Wandle Restoration Project + (Assessment and monitoring program)
- Case study:The South Hams River Improvement Project (SHRImP) + (Improvement of channel morphology)
- Flood detention basin (HRB) Ickern-Mengede + (Channel naturalisation)
- Case study:Spring Meadow Meander Restoration + (Improvement of channel morphology)
- Case study:South Calder Water deculverting and habitat restoration + (Improvement of channel morphology)
- Case study:River Gaywood – Seven Sisters Drain + (Improvement of channel morphology)
- Case study:MisbourneRiverAction + (Improvement of channel morphology)
- Case study:Letting the Dove Flow 2 + (Channel naturalisation)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:West Amesbury + (Re-meandering)
- Case study:Arborfield nature like bypass and weirs project + (Bypass channel)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Creation of fish passes)
- Case study:River Wandle: Butter Hill Phase 3 + (Enhancing flow diversity)
- Case study:Tichborne River Restoration Project + (Adding sinuosity)