Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Poyle channel enhancement and weir removal + (Creation of pools and riffles)
- Case study:Weir Road + (Creation of pools and riffles)
- Case study:Ladywell Fields to Cornmill Gardens + (Creation of meanders)
- Case study:Plough Lane weir removal + (Creation of pools and riffles)
- Case study:Ravensbourne at Queensmead + (Creation of meanders)
- Case study:New South Quarter - Croydon + (Creation of pools and riffles)
- Case study:River Pinn Enhancement near Ickenham + (Creation of backwater)
- Case study:Mill Green + (Creation of meanders)
- Case study:Ladywell Fields Phase 2 + (Creation of meanders)
- Case study:Medland Close, River Wandle + (Creation of pools and riffles)
- Case study:Reopening and restoration of the stream Hovinbekken + (Creation of pools and riffles)
- Case study:Teglverksdammen + (Creation of pools and riffles)
- Case study:River Cole- Life Project + (Creation of secondary channel)
- Case study:Kleblach-Side channel + (Creation of side channel)
- Case study:Buiten Ooij + (Creation of side channel)
- Case study:Opijnen- Side channel + (Creation of side channel)
- Case study:Inturia dam removal + (Creation of solid flow regime)
- Case study:Isar-Plan + (Channel widening)
- Case study:River Hogsmill Restoration Project + (Creation of meanders)
- Case study:River Avon at East Chisenbury + (Creation of wooden deflectors)
- Case study:River Tat Restoration Scheme + (Introducing large woody debris)
- Case study:Guphill Brook Riverine Enhancement + (Creation of wooden deflectors)
- Case study:Wellow Brook Habitat Enhancement Project + (Introducing large woody debris)
- Case study:SHerston River IMProvement (SHRIMP) Project + (Introducing large woody debris)
- Case study:Dorset CPAF Projects + (Cut back of trees)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Dam removal)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Decrease sedimentation)
- Case study:Lullingstone Castle + (Decrease sedimentation)
- Case study:Sutcliffe Park + (Creation of new channel)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Deculverting)
- Case study:Tanners Brook + (Deculverting)
- Case study:Norman Park Bromley. + (Deculverting)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Development of a flow control structure)
- Case study:The Dart and Teign River Improvement Project (DTRIP) + (Diversification of in-channel features)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Diversification of in-channel features)
- Case study:Western Rother Fishery Habitat Enhancement + (Diversification of in-channel features)
- Case study:Thames 21 Salmons Brook Diffuse Pollution Urban Project + (Diversification of in-channel features)
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Diversification of in-channel features)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (Diversification of in-channel features)
- Case study:Merton Abbey Mills Eel Pass + (Eel pass installation)
- Flood detention basin (HRB) Ickern-Mengede + (Channel naturalisation)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Re-meandering)
- Case study:Charlton St Peter A 8 + (Channel narrowing)
- Case study:Knepp Rewilding Project + (Channel realignment)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Adding sinuosity)
- Case study:River Wandle: Butter Hill Phase 3 + (Enhancing flow diversity)
- Case study:Gunville Phase I + (Enhancing flow diversity)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Ensuring an additional contribution to l’A … Ensuring an additional contribution to l’Albufera of water from the Júcar-Túria system through rapid flushing technical discharges; Increase the proportion of water inputs to l’Albufera from rivers with respect to the water inputs from sewage and treatments plants; Preserve contributions from Xúquerplants; Preserve contributions from Xúquer)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Eradication of Rana Bedriagae)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Flooding of small islands)
- Case study:Wild Wylye Phase 1 + (Channel realignment)