Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Short Heath Brook Project + (Creation of braided channel)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Channel naturalisation)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Creation of new channel)
- Case study:Rottal Burn + (Adding sinuosity)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Channel widening)
- Case study:Lower Aurino river: San Giorgio di Brunico riverbed widening + (Channel widening)
- Case study:Zero river restoration project + (Channel widening)
- Case study:Scolo Desolino restoration project + (Channel naturalisation)
- Case study:Upper Emscher + (Removal of concrete bank protection)
- Case study:Rio Sant'Ambrogio restoration project + (Channel naturalisation)
- Case study:Pagana canal restoration project + (Channel widening)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (Channel widening)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (Channel widening)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Channel widening)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (Channel widening)
- Case study:Wildling the Tame + (Channel widening)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Channel widening)
- Case study:Hofstadelva + (Channelling)
- Case study:Beddington Park Enhancements + (Channel narrowing)
- Case study:Stage 0 channel restoration + (Cleaning of spawning gravels)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Removal of fords)
- Case study:RESTORATION OF THE TRESENEC STREAM + (Construction of the overflows between individual meanders)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-naturalization of a rectified canal section replacing the infesting vegetation)
- Case study:Watercress Farm Rewetting Project + (Creating a new river channel demanded specialised insight and expert execution. Ecosulis)
- Case study:Stora, Holstebro HEP station + (Creating new bypass riffle)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Creation of a sinuous channel)
- Case study:River Hogsmill Restoration Project + (Creation of an island)
- Case study:Taming the Tame + (Creation of an island)
- Case study:Upper Cringle Floodplain Restoration Project + (Creation of an island)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Re-instatement of old course)
- Case study:River Skerne- Life project + (Adding sinuosity)
- Case study:River Cole- Life Project + (Creation of secondary channel)
- Case study:River Roding at Ray Lodge Park + (Creation of backwater)
- Case study:Beneden-Leeuwen-Side channel + (Side channel created)
- Case study:Arborfield nature like bypass and weirs project + (Bypass channel)
- Case study:Long Eau (Great Eau) + (Creation of backwater)
- Case study:Mayesbrook Climate Change Park restoration project + (Improvement of channel morphology)
- Case study:Tall River + (Creation of backwater)
- Case study:River Dearne at Mexborough + (Channel narrowing)
- Case study:River Nene Nature Improvement Area + (Creation of backwater)
- Case study:Ravensbury Park + (Creation of backwater)
- Case study:Habitat Improvements on the River Colne at West Drayton + (Creation of backwater)
- Case study:Dagenham Washlands Phase 2 + (Creation of backwater)
- Case study:County Gardens, Mayes Brook + (Creation of backwater)
- Case study:Hogsmill Sewage Treatment Works phase 1 + (Creation of backwater)
- Case study:Fishery/habitat enhancement on the Grand Union Canal + (Creation of backwater)
- Case study:Boulder Pool and Plough Lane + (Creation of backwater)
- Case study:Land at Buzzards Mouth Creek + (Creation of backwater)
- Case study:Brent Lodge Park Improvement + (Creation of backwater)
- Case study:Poulter Park Lake Eel Pass + (Creation of backwater)
- Case study:King Georges Playing Field + (Creation of backwater)
- Case study:Ravensbury Park back channel + (Creation of backwater)
- Case study:River Pinn Enhancement near Ickenham + (Creation of backwater)