Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Restoration at Hunworth (River Glaven) + (Adding sinuosity)
- Case study:Upper Emscher + (Removal of concrete bank protection)
- Case study:Babingley River at Hillington + (Channel narrowing)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Re-meandering)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Re-meandering)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Adding sinuosity)
- Case study:Bocq river (Walphy - LIFE project) + (Adding sinuosity)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Adding sinuosity)
- Case study:Tichborne River Restoration Project + (Adding sinuosity)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Adding sinuosity)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Alnus glutinosa L.)
- Case study:Fluvial river restoration of Tordera in Tordera + (Re-instatement of old course)
- Case study:Environmental restoration of the river Zújar + (Protecting and promoting wildlife)
- Case study:River Wandle Restoration Project + (Assessment and monitoring program)
- Case study:River restoration and flood alleviation on the River Brain at Witham + (Back channel created)
- Case study:Upper Cringle Floodplain Restoration Project + (Back channel created)
- Case study:Wellow Brook Habitat Enhancement Project + (Introducing large woody debris)
- Case study:River Wensum Restoration, Reach 10 Lenwade + (Brushwood berms to increase scour on the gravels)
- Case study:Arborfield nature like bypass and weirs project + (Bypass channel)
- Case study:Blanice River + (Bypass channel)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Bypass channel)
- Case study:Ravensbourne/Pool confluence weir bypass channel + (Bypass channel)
- Case study:Aston Clinton River Restoration + (Bypass channel)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Canals to improve the hydrologic regime)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Canals to improve the hydrologic regime)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Canals to improve the hydrologic regime)
- Case study:River Valency at Boscastle + (Change in bed profile)
- Case study:Stabilization of hydrological situation on the Neznaika River + (Change in bed profile)
- Case study:Upper River Nairn restoration project + (Changing from a canalised straightened channel to a meandering/ wondering channel)
- Case study:River Wid restoration scheme + (Channel narrowing)
- Case study:River Bure + (Channel narrowing)
- Case study:River Wensum Rehabilitation Project - Bintree + (Channel narrowing)
- Case study:Renaturierung Untere Havel + (Channel narrowing)
- Case study:Bleinheim Palace Project + (Channel narrowing)
- Case study:River Kennet Restoration at Durnsford + (Channel narrowing)
- Case study:River Avon at East Chisenbury + (Creation of wooden deflectors)