Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Langonnet river + (Creation of pools and riffles)
- Case study:Habitat improvement measures in Bortneelva + (Deflectors)
- Case study:Habitat measures Hollundbekken + (introduction of spawning substrate and larger stones in the creek)
- Case study:Rheinauen bei Rastatt + (Bank improvement)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Green filters creation and two shallow)
- Case study:Small water retention measures in Haluzice Gorge + (Creation of stone steps)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (re-meandering)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (reactivation and extending of tributary streams)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Removal of a part of the dam up to 1 m)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Restoration of the connection of side arms)
- Case study:Valtellina 2005 – New green system + (reforestation)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Flood detention basin (HRB) Ickern-Mengede + (removal of bottom slab formwork)
- Case study:Pagana canal restoration project + (removal of cement covers)
- Case study:Restoration of the river continuity on the Touques Basin +
- Case study:Bowston Weir Removal + (removal of dams)
- Case study:Restoration of the river continuity on the Touques Basin + (removal of sluices)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Construction of a defensive wall to prevent river pollution)
- Case study:Letting the Dove Flow + (Allowing stone weirs and bank reinforcements to break down)
- Case study:Letting the Dove Flow 2 + (removing or breaching weirs and reinforcements)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Southington River Restoration Project + (This project took place on the River Test at Overton)
- Case study:Barking Creek near A13 + (retreat and renewal of folld defences)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising)
- Case study:Restoration of the river Børselva + (Cut back of plants)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Lodge Burn Flood Alleviation Scheme + (Culvert replacement/repair)
- Case study:Robledo de Chavela dam removal + (Dam removal)
- Case study:Removal and opening of sluice gates on the Vence River + (sluice gate removal)
- Case study:Mains of Dyce + (step pool)
- Case study:Test and Itchen River Restoration Strategy 2 + (Bed raising)
- Case study:Restoration of side channels of the Loire and its tributaries + (treating riverside vegetation)
- Case study:Upper Witham Restoration + (Various in-channel measures e.g brushwood berms)
- Case study:Wyndham Park, Grantham + (Adding Gravel)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (water)