Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Prologis Midpoint Park river restoration scheme + (formation of back channel with three islands)
- Case study:Stainby Road, Colsterworth + (Bank Lowering)
- Case study:Hills to Levels + (Bank stabilisation)
- Case study:Mill Brook, Tattenhall, Cheshire + (habitat creation)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Lodge Burn Flood Alleviation Scheme + (Culvert replacement/repair)
- Case study:Unit 4 - North Channel Phase 1 + (Introducing large woody debris)
- Case study:Wensum River Restoration and Floodplain Enhancement + (habitat improvements)
- Case study:Amwell Loop + (habitat improvements)
- Case study:Beverley Brook d/s of Rock’s Lane + (habitat improvements)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (habitat improvements)
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (habitat improvements)
- Case study:Habitat measures in Strynevassdraget + (habitat improvements)
- Case study:Restoration in Bognelva + (Morphological diversification)
- Case study:Unit 3a – Hurst Bridge 2013 + (Introducing large woody debris)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (highten the bottom of the stream to reconnect alluvial wetlands)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (hydrological recovery actions (stabilization of slopes and recovery of margins witch present erosion problems).)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Restoration of the connection of side arms)
- Case study:Syston and Barkston Restoration + (Tree works including hinging and daylighting)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Langonnet river + (introduction of blocks)
- Case study:Habitat improvement measures in Bortneelva + (introduction of blocks)
- Case study:Habitat measures Hollundbekken + (introduction of spawning substrate and larger stones in the creek)
- Case study:Rheinauen bei Rastatt + (Bank improvement)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (re-meandering)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Green filters creation and two shallow)
- Case study:Small water retention measures in Haluzice Gorge + (Creation of stone steps)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (reactivation and extending of tributary streams)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Removal of a part of the dam up to 1 m)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Restoration of the connection of side arms)
- Case study:Valtellina 2005 – New green system + (reforestation)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Flood detention basin (HRB) Ickern-Mengede + (removal of bottom slab formwork)
- Case study:Pagana canal restoration project + (removal of cement covers)
- Case study:Restoration of the river continuity on the Touques Basin + (removal of sluices)
- Case study:Bowston Weir Removal + (removal of dams)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Construction of a defensive wall to prevent river pollution)
- Case study:Letting the Dove Flow + (Allowing stone weirs and bank reinforcements to break down)
- Case study:Letting the Dove Flow 2 + (removing or breaching weirs and reinforcements)
- Case study:Southington River Restoration Project + (This project took place on the River Test at Overton)
- Case study:Barking Creek near A13 + (retreat and renewal of folld defences)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising)
- Case study:Restoration of the river Børselva + (Cut back of plants)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))