Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Test and Itchen River Restoration Strategy 2 + (Bed raising)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Morphological redevelopment: reshaping and re-profiling of the banks; Installation of deflectors)
- Case study:Logie Burn Restoration Project + (Re-profiling)
- Case study:Černý potok stream restoration scheme + (construction of nearly completly new streambeds and directing water freely to the alluvial meadows)
- Case study:Lower River Roding Regeneration Project + (construction of new intertidal area)
- Case study:Barking Creek near A13 + (retreat and renewal of folld defences)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (excavation in the U form)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Greenwich Peninsula + (Bank improvement)
- Case study:Mill Pool + (creation of intertidal terraces)
- Case study:Syston and Barkston Restoration + (Tree works including hinging and daylighting)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (creation of new branches)
- Case study:Hedleyhope Burn + (creation of rock pools downstream of culvert)
- Case study:The River Deerness Project + (creation of rock pools downstream of culvert)
- Case study:Bakenhof Dyke reconstruction + (creation of secondary channel)
- Case study:Grantham Blue Green - Urban Reach + (Tree Hinging adding gravel)
- Case study:Hierdense Beek + (Sand deposit)
- Case study:Pagana canal restoration project + (removal of cement covers)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Goldrill Beck River Restoration + (embankment removal)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Remodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (excavation in the U form)
- Case study:Malltraeth Marsh + (excavation of historic channels)
- Case study:Robledo de Chavela dam removal + (Dam removal)
- Case study:Snettisham River Ingol Woody Habitat Project + (Habitat restoration)
- Case study:Dunston Beck Restoration + (faggot berms)
- Case study:Prologis Midpoint Park river restoration scheme + (formation of back channel with three islands)
- Case study:Stainby Road, Colsterworth + (Bank Lowering)
- Case study:Hills to Levels + (Bank stabilisation)
- Case study:Mill Brook, Tattenhall, Cheshire + (habitat creation)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Lodge Burn Flood Alleviation Scheme + (Culvert replacement/repair)
- Case study:Unit 4 - North Channel Phase 1 + (Introducing large woody debris)
- Case study:Wensum River Restoration and Floodplain Enhancement + (habitat improvements)
- Case study:Amwell Loop + (habitat improvements)
- Case study:Beverley Brook d/s of Rock’s Lane + (habitat improvements)
- Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) + (habitat improvements)
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (habitat improvements)
- Case study:Habitat measures in Strynevassdraget + (habitat improvements)
- Case study:Restoration in Bognelva + (Morphological diversification)
- Case study:Unit 3a – Hurst Bridge 2013 + (Introducing large woody debris)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (highten the bottom of the stream to reconnect alluvial wetlands)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (hydrological recovery actions (stabilization of slopes and recovery of margins witch present erosion problems).)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)