- Case study:River Trent, Bucknall Park + (Weir removal)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Restoration of the river continuity on the Touques Basin + (removal of sluices)
- Case study:Removal of the Ver mill weir on the Sienne River + (Weir removal)
- Case study:Removal of the Brosses weir on the Soanan River + (Weir removal)
- Case study:Ennerdale Mill Weir Removal + (Weir removal)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Mulkear Life Project + (Weir removal/modification for easement of fish passage)
- Case study:River Irwell Restoration Project + (Weir removal/modification for easement of fish passage)
- Case study:Burton Weir (Upper) Fish Pass Project + (Weir removal/modification for easement of fish passage)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Weir removal/modification for easement of fish passage)
- Case study:Newe Fish Pass Improvements project + (Weir removal/modification for easement of fish passage)
- Case study:Goshen Weir removal project, River Roch, Bury + (Weir removal/modification for easement of fish passage)
- Case study:Diffusing the Issue in rural Ribble - Skirden Beck + (Bank reprofiling)
- Case study:Diffusing the Issue in rural Ribble - Easington + (Bank reprofiling)
- Case study:Pearls in Peril LIFE+ GB Project - River Ehen + (Willow spiling)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (adding roughness)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Gilev's Grove reconstruction + (banks strengthening with geotextile and villow plantening)
- Case study:Grantham Blue Green - Urban Reach + (Tree Hinging adding gravel)
- Case study:Little Ponton + (brushwood mattress installation)
- Case study:Test and Itchen River Restoration Strategy 2 + (Bed raising)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Morphological redevelopment: reshaping and re-profiling of the banks; Installation of deflectors)
- Case study:Logie Burn Restoration Project + (construction of bunds)
- Case study:Černý potok stream restoration scheme + (construction of nearly completly new streambeds and directing water freely to the alluvial meadows)
- Case study:Lower River Roding Regeneration Project + (construction of new intertidal area)
- Case study:Barking Creek near A13 + (retreat and renewal of folld defences)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (excavation in the U form)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Greenwich Peninsula + (Bank improvement)
- Case study:Mill Pool + (creation of intertidal terraces)
- Case study:Syston and Barkston Restoration + (Tree works including hinging and daylighting)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (creation of new branches)
- Case study:Hedleyhope Burn + (creation of rock pools downstream of culvert)
- Case study:The River Deerness Project + (creation of rock pools downstream of culvert)
- Case study:Bakenhof Dyke reconstruction + (creation of secondary channel)
- Case study:Grantham Blue Green - Urban Reach + (Tree Hinging adding gravel)
- Case study:Hierdense Beek + (Sand deposit)
- Case study:Pagana canal restoration project + (removal of cement covers)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Goldrill Beck River Restoration + (embankment removal)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Remodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:Malltraeth Marsh + (excavation of historic channels)
- Case study:Robledo de Chavela dam removal + (Dam removal)
- Case study:Snettisham River Ingol Woody Habitat Project + (Habitat restoration)