- Case study:Limestone Ribble Restoration Project + (Tree planting)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Tree planting)
- Case study:Source to Sea Programme + (Blocking of certain grips)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (Tree planting)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Tree planting)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Blocking of certain grips)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (Blocking of certain grips)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (Tree planting)
- Case study:River Tame at Salford Park ("SMURF") + (Tree planting)
- Case study:SMURF Tame + (Bank improvement)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Creation of notches)
- Case study:Resilient River + (Introduction of gravel)
- Case study:Project Usk River Restoration (PURR) 2012-2013 + (Tree removal)
- Case study:Project Usk River Restoration (PURR) 2011-2012 + (Creation of fish passes)
- Case study:River Wandle: Butter Hill Phase 3 + (Introduction of gravel)
- Case study:Syston and Barkston Restoration + (Tree works including hinging and daylighting)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:Upper Witham Restoration + (Various in-channel measures e.g brushwood berms)
- Case study:Dove Weir removal + (Vegetation cut back)
- Case study:Beekherstel Buurserbeek + (Vergraven van de oever)
- Case study:Herinrichting Beekloop + (Dood hout)
- Case study:Abaissement et démantèlement de trois clapets sur l’Orge aval + (Lowering of checking valves)
- Case study:Upper River Witham : Easton + (Weir Removal)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (excavation in the U form)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Weir construction)
- Case study:Langford Lakes project + (Planting)
- Case study:Rinya water-system reconstruction + (Reduction of bank slope)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Aforestation)
- Case study:Small water retention measures in Haluzice Gorge + (Creation of stone steps)
- Case study:Partial removal of weir on the Sanguèze at Mouzillon + (Weir lowering)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (Weir lowering)
- Case study:Arborfield nature like bypass and weirs project + (Introduction of spawning gravels)
- Case study:River Wandle: Butter Hill Phase 3 + (Introduction of gravel)
- Case study:Restoration of the river continuity on the Touques Basin + (removal of sluices)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Weir lowering)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Dredging)
- Case study:Water and Life for Drava and Vuka + (Dredging of sediment (mud))
- Case study:Kentchurch Weir Removal + (Weir removal)
- Case study:Harbertonford Flood Alleviation Scheme + (Bed lowering)
- Case study:Water of Dye Fish Pass Project + (Weir modification)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Bed reprofiling)
- Case study:Tolka Valley Park at Finglas + (Weir removal)
- Case study:Charlton St Peter A 8 + (Bed raising)
- Case study:Thames Lock Weir, Brentford eel pass + (Weir modification)
- Case study:Beddington Park Enhancements + (Weir modification)
- Case study:Osterley Weir, Hanwell eel pass + (Weir modification)
- Case study:Eel Pass over tilting weir at Ravensbury Park + (Weir modification)
- Case study:Bell Green Weir fish passage + (Weir modification)