Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Structuring of shoreline)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The old arm is preserved and a rockfill merlon is set up at the junction of the two beds for divert the waters to the new route)
- Case study:Southington River Restoration Project + (This project took place on the River Test at Overton)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Chigwell Brook + (Deculverting)
- Case study:Laymer Road Silt Trap and Recreational Ground + (Toeboard removal)
- Case study:Linear Park + (Bank reprofiling)
- Case study:Ladywell Fields toeboarding + (Bank reprofiling)
- Case study:Malden Golf Course + (Toeboard removal)
- Case study:Morden Hall Park Water Vole Habitat Enhancement + (Bank reprofiling)
- Case study:Salmons Brook River Restoration at Laymer Road + (Toeboard removal)
- Case study:Beddington Park + (Bank reprofiling)
- Case study:Silk Stream toeboard removal + (Bank reprofiling)
- Case study:Wimbledon Common + (Toeboard removal)
- Case study:Yeading Brook fields - Reedbed creation + (Deflectors)
- Case study:Voorste Nete at Dessel + (Translocation of original substrate into new channel)
- Case study:Upper River Witham : Easton + (Weir Removal)
- Case study:River Witham Great Ponton + (Tree Hinging)
- Case study:Manthorpe Floodplain Reconnection + (Channel modification)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel narrowing)
- Case study:Grantham Blue Green - Urban Reach + (Tree Hinging adding gravel)
- Case study:Papermill Weir Section in-channel restoration + (Tree hinging and adding gravel.)
- Case study:Aubourn Rock Ramp and Habitat Works + (Tree hinging over long section and large rock ramp installation to replace existing large weir that was a barrier to fish passage.)
- Case study:Westborough + (Tree hinging work over long section of Witham.)
- Case study:River Avon at East Chisenbury + (Tree management)
- Case study:Holmsley Inclosure Stream Restoration + (Tree management)
- Case study:The Tubney Charitable Trust + (Tree management)
- Case study:Hoffer Brook + (Tree management)
- Case study:Stabilization of hydrological situation on the Neznaika River + (Tree management)
- Case study:Colne Water Restoration Project + (Tree planting)
- Case study:Limestone Ribble Restoration Project + (Tree planting)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Tree planting)
- Case study:Source to Sea Programme + (Blocking of certain grips)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (Tree planting)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Tree planting)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Blocking of certain grips)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (Blocking of certain grips)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (Tree planting)
- Case study:River Tame at Salford Park ("SMURF") + (Tree planting)
- Case study:SMURF Tame + (Bank improvement)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Creation of notches)
- Case study:Resilient River + (Introduction of gravel)
- Case study:Project Usk River Restoration (PURR) 2012-2013 + (Tree removal)
- Case study:Project Usk River Restoration (PURR) 2011-2012 + (Creation of fish passes)
- Case study:River Wandle: Butter Hill Phase 3 + (Introduction of gravel)
- Case study:Syston and Barkston Restoration + (Tree works including hinging and daylighting)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:Upper Witham Restoration + (Various in-channel measures e.g brushwood berms)
- Case study:Dove Weir removal + (Vegetation cut back)