Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Hoffer Brook + (Bed lowering at impoundment and bed raising with gravel (and mesh))
- Case study:Pow Burn Restoration Project + (Set back embankments)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Stoney Sluice, Brentford eel pass + (Sluice improvement)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (New outflow and inflow from ecoremediation system)
- Case study:Bocking Blackwater River Restoration + (Soft engineering solutions)
- Case study:River Avon Stream project + (Planting)
- Case study:Pickering Beck & Dutchy Water improvement project + (Soft erosion solutions)
- Case study:Great Ryburgh End Restoration Scheme + (Diversification of in-channel features)
- Case study:Bow Brook Living Landscape + (Introducing large woody debris)
- Case study:Stony Stratford Sluice bank repairs + (Soft erosion solutions)
- Case study:Source to Sea Programme – 11. River Rawthey + (Soft erosion solutions)
- Case study:Resilient River + (Introduction of gravel)
- Case study:Watercress Farm Rewetting Project + (Specialised equipment)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Weir lowering)
- Case study:Burn of Balmaleedy Restoration, Marykirk + (Step-pool section at d/s end of restored reach)
- Case study:Beekherstel Zuidelijk Afwateringskanaal + (Stroombaanmaaien)
- Case study:Beekherstel Eefsebeek + (Stroombaanmaaien)
- Case study:Beek Lage Raam + (Stroombaanmaaien)
- Case study:Beekherstel Reusel Baarschot-Diessen + (Stroombaanmaaien)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Structural restoration and maintenance of reservoirs;)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Construction of a bypass channel)
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Structuring of shoreline)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The old arm is preserved and a rockfill merlon is set up at the junction of the two beds for divert the waters to the new route)
- Case study:Southington River Restoration Project + (This project took place on the River Test at Overton)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Chigwell Brook + (Deculverting)
- Case study:Laymer Road Silt Trap and Recreational Ground + (Toeboard removal)
- Case study:Linear Park + (Toeboard removal)
- Case study:Ladywell Fields toeboarding + (Toeboard removal)
- Case study:Malden Golf Course + (Toeboard removal)
- Case study:Morden Hall Park Water Vole Habitat Enhancement + (Toeboard removal)
- Case study:Salmons Brook River Restoration at Laymer Road + (Toeboard removal)
- Case study:Beddington Park + (Toeboard removal)
- Case study:Silk Stream toeboard removal + (Toeboard removal)
- Case study:Wimbledon Common + (Toeboard removal)
- Case study:Yeading Brook fields - Reedbed creation + (Toeboard removal)
- Case study:Voorste Nete at Dessel + (Translocation of original substrate into new channel)
- Case study:Upper River Witham : Easton + (Weir Removal)
- Case study:River Witham Great Ponton + (Tree Hinging)
- Case study:Manthorpe Floodplain Reconnection + (Channel modification)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel narrowing)
- Case study:Grantham Blue Green - Urban Reach + (Tree Hinging adding gravel)
- Case study:Papermill Weir Section in-channel restoration + (Tree hinging and adding gravel.)
- Case study:Aubourn Rock Ramp and Habitat Works + (Tree hinging over long section and large rock ramp installation to replace existing large weir that was a barrier to fish passage.)
- Case study:Westborough + (Tree hinging work over long section of Witham.)
- Case study:River Avon at East Chisenbury + (Deflectors)
- Case study:Holmsley Inclosure Stream Restoration + (Bed raising)
- Case study:The Tubney Charitable Trust + (Creation of fish passes)
- Case study:Hoffer Brook + (Bed lowering at impoundment and bed raising with gravel (and mesh))
- Case study:Stabilization of hydrological situation on the Neznaika River + (Creation of revetments)
- Case study:Colne Water Restoration Project + (Tree planting)
- Case study:Limestone Ribble Restoration Project + (Tree planting)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Tree planting)
- Case study:Source to Sea Programme + (Blocking of certain grips)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (Tree planting)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Tree planting)