Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:RSPB Fowlmere Nature Reserve + (Cut back of plants)
- Case study:Arborfield nature like bypass and weirs project + (Introduction of spawning gravels)
- Case study:Salisbury Avon Restoration Project + (Introduction of spawning gravels)
- Case study:Wild Wylye Phase 1 + (Bed raising)
- Case study:Seven Hatches + (Introducing sediment)
- Case study:Longstreet A 91a + (Gravel berms)
- Case study:Enler River enhancement project + (Deflectors)
- Case study:Crane Meadows Meander Connections + (Riffle creation)
- Case study:River Glyme Stratford Restoration + (Introducing large woody debris)
- Case study:Wildling the Tame + (Channel reprofiling)
- Case study:Restoration and environmental interpretation of the Riparian Forest of Nestos Delta + (Riparian planting)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Construction of a bypass channel)
- Case study:Mill Brook, Tattenhall, Cheshire + (habitat creation)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Removal of invasive plants)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Bank improvement)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Riverbank revegetation)
- Case study:Remeandering of the Mardereau stream at Sorigny + (Riverbank revegetation)
- Case study:Keent + (Connection between river channel and former side branches)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Dam removal)
- Case study:Restoration of the previous riverbed of the Dadon + (Implementation of rip rap)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (Weir removal)
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:Friends of Bottesford Beck + (Riverbed restoration)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Riverbed restoration)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The old arm is preserved and a rockfill merlon is set up at the junction of the two beds for divert the waters to the new route)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds)
- Case study:Rinya water-system reconstruction + (Reduction of bank slope)
- Case study:Lodge Burn Flood Alleviation Scheme + (Rock ramp construction)
- Case study:Abbey Brook Weir + (Rock ramp construction)
- Case study:March Burn at Riding Mill + (Rock ramp construction)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Rock ramp construction)
- Case study:Telford Catchment Restoration Project + (Rock ramp construction)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (Rock ramp construction)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Rock ramp construction)
- Case study:Bowston Weir Removal + (Rock ramp construction)
- Case study:Hierdense Beek + (Sand deposit)
- Case study:Lunterse Beek + (Dead wood deposit)
- Case study:Lea Bridge Waterway Wall Improvements + (Sandmartin tubes installation)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures)
- Case study:Gategill Beck: Abandoned Metal Mines + (Deculverting)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (Sediment trap building)
- Case study:Langford Lakes project + (Planting)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Restoration of the river Børselva + (Cut back of plants)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Seeding of willows and helophytes)
- Case study:Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) + (Self-initiated bank erosion by sediment input)
- Case study:Hoffer Brook + (Bed lowering at impoundment and bed raising with gravel (and mesh))
- Case study:Resilient River + (Introduction of gravel)
- Case study:Pow Burn Restoration Project + (Set back embankments)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Stoney Sluice, Brentford eel pass + (Sluice improvement)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (New outflow and inflow from ecoremediation system)
- Case study:Bocking Blackwater River Restoration + (Soft engineering solutions)
- Case study:River Avon Stream project + (Planting)
- Case study:Pickering Beck & Dutchy Water improvement project + (Soft erosion solutions)