Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Bank stabilisation)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Restoration of natural vegetation)
- Case study:Saving Chiswick Eyot + (Bank stabilisation)
- Case study:River Wandle: Butter Hill Phase 3 + (Introduction of gravel)
- Case study:Restoring the natural dynamics of the upper Adour + (Restoration of side channels)
- Case study:Restoration in Bognelva + (Morphological diversification)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Providing of continuity)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)
- Case study:Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) + (Restoration of the connection of side arms)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Removal of bank reinforcements)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Embankment renaturalization)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Restoration of the connection of side arms)
- Case study:Doñana 2005 + (Removal of contaminated material)
- Case study:Wensum River Restoration and Floodplain Enhancement, Pensthorpe + (Restoring gravel bed)
- Case study:Platt Brook Restoration + (Restoring gravel bed)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Alteration in channel dimensions)
- Case study:Gunville Phase I + (Restoring gravel bed)
- Case study:River Glyme Stratford Restoration + (Introducing large woody debris)
- Case study:Restoring connectivity of the ecological corridor in the Biała River valley + (Restoring riparian vegetation)
- Case study:River Wandle Restoration Project + (Introducing large woody debris)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (Restoring riparian vegetation)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Construction of weak and identical slopes on straight sections)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species)
- Case study:The Monmouthshire, Olway and Trothy (MOAT) Project + (Restoring rivers)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Rinya water-system reconstruction + (Reventment renewal)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (Revetmens with local species)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Removal of revetments)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Bank stabilisation)
- Case study:Restoration of the stream of the Partido + (Elimination of the pipeline on the left bank)
- Case study:Recovery of the functionality of Brazo de la Torre + (Revetmens with local species)
- Case study:River restoration project in Sella, Asturias + (Revetmens with local species)
- Case study:Regeneration of the banks of the river Mape + (Revetmens with local species)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Revetmens with local species)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Revetmens with local species)
- Case study:Llobregat river restoration + (Revetmens with local species)
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (Revetmens with local species)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (Revetmens with local species)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (New bioengineering elements in order to stabilize slope banks)
- Case study:Environmental improvement project of the stream of Ruby + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration project in Turia River + (Revetmens with local species)
- Case study:Pipeline and WFD Project 2 + (Revetment work)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Revetments with local species)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Revetments with local species)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Embankment creation)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (New bioengineering elements in order to stabilize slope banks)
- Case study:Rother meander reconnection + (Re-grading)
- Case study:RSPB Fowlmere Nature Reserve + (Cut back of plants)
- Case study:Arborfield nature like bypass and weirs project + (Introduction of spawning gravels)
- Case study:Salisbury Avon Restoration Project + (Introduction of spawning gravels)
- Case study:Wild Wylye Phase 1 + (Bed raising)