Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Linear Park + (Bank reprofiling)
- Case study:Fordmill weir + (Bank reprofiling)
- Case study:Lewisham College weir + (Removing of concrete structures)
- Case study:River Brent at Brent Cross + (Removing of concrete structures)
- Case study:Rainham Creek Tidal Sluice Removal + (Removing of concrete structures)
- Case study:Teddington Wharf + (Removing of concrete structures)
- Case study:Mottingham Farm + (Bank reprofiling)
- Case study:Ladywell Fields to Cornmill Gardens + (Bank reprofiling)
- Case study:Manor House Gardens + (Removing of concrete structures)
- Case study:Brent Lodge Park Improvement + (Deculverting)
- Case study:Harrow Lodge Park + (Deculverting)
- Case study:Broadway Fields/ Seagers Distillary + (Bank reprofiling)
- Case study:Roneo Corner + (Removing of concrete structures)
- Case study:Frog Island + (Removing of concrete structures)
- Case study:Fairlop Plain and Fairlop Water + (Deculverting)
- Case study:Colfes School + (Bank reprofiling)
- Case study:Haynes Park + (Removing of concrete structures)
- Case study:Mill Green + (Removing of concrete structures)
- Case study:Ladywell Fields Phase 2 + (Bank reprofiling)
- Case study:Loxford Water + (Deculverting)
- Case study:Merdian Water development site + (Removing of concrete structures)
- Case study:King Georges Park + (Removing of sheet piling)
- Case study:Sainsburys, Hertford + (Bank reprofiling)
- Case study:Broom Road Recreation Ground + (Bank reprofiling)
- Case study:Lee Navigation by Walthamstow Marshes + (Removing of sheet piling)
- Case study:Garratt Park + (Removing structures)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Renewal of reventments)
- Case study:Rehabilitation of Benta stream + (Renewal of reventments)
- Case study:Reopening of the culverted Redon river + (Reopening of culverted river)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Reopening of Mjølløst stream + (Reopening of culverted river)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (Weir removal)
- Case study:Habitat measures in Strynevassdraget + (habitat improvements)
- Case study:Restoration of the river Akerselva + (Habitat restoration)
- Case study:Restoration in Bognelva + (Morphological diversification)
- Case study:Inchewan Burn Bed restoration + (Removal of artificial wire/stone bed)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Salzano wetland and Marzenego river restoration project + (Reshaping the net of canals)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Restoration of hydraulic functionality; Morphological redevelopment: reshaping and re-profiling of the banks; Reopening/reactivation of the resurgence; Creation of a small pond for amphibious and other animals)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Restoration of hydraulic functionality; Morphological redevelopment: reshaping and re-profiling of the banks; Excavation of the isthmus to create an island used for the reproduction of target species)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Restoration of hydraulic functionality; Morphological redevelopment: reshaping and re-profiling of the banks; Reopening of the head of the Castellaro spring system)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Bank stabilisation)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Restoration of natural vegetation)
- Case study:Saving Chiswick Eyot + (Bank stabilisation)
- Case study:River Wandle: Butter Hill Phase 3 + (Introduction of gravel)
- Case study:Restoring the natural dynamics of the upper Adour + (Restoration of side channels)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Providing of continuity)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)
- Case study:Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) + (Restoration of the connection of side arms)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Removal of bank reinforcements)