Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:South Esk restoration + (Removal of invasive species)
- Case study:River Kennet Restoration at Durnsford + (Regrading)
- Case study:River North Esk Maintenance + (Removal of invasive species)
- Case study:River Monnow (Going Native) + (Removal of invasive species)
- Case study:Saving Chiswick Eyot + (Bank stabilisation)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Dam removal)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Removal of lateral dikes)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Removal of metal sheet piles)
- Case study:Thur + (Removal of northern overbank)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Removal of obstructions to flow)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Lowering of dike)
- Case study:Reconnecting the Rivers + (Creation of fish passes)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Habitat and water flow restoration on River Rábca + (Removal of reed)
- Case study:Timber float restorations at River Iijoki + (Building submerged weir)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Removal of revetments)
- Case study:Renaturierung Untere Havel + (Bed raising)
- Case study:River Quaggy- Chinbrook meadows + (Removal of revetments)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments)
- Case study:Room for the River + (Removal of revetments)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Removal of revetments)
- Case study:Fluvial improvement in Riera de Caldés + (Removal of rip-rap)
- Case study:Wummewiesen restoration project + (Weir removal)
- Case study:Lippeaue Klostermersch + (Bed raising)
- Case study:River restoration project in Sella, Asturias + (Revetmens with local species)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (New bioengineering elements in order to stabilize slope banks)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Removal of rip-rap)
- Case study:Conservation of alluvial + (Dredging)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (Removal of sediment)
- Case study:Restoration of the stream of the Partido + (Removal of sediment)
- Case study:Recovery of the functionality of Brazo de la Torre + (Removal of sediment)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Removal of sediment)
- Case study:Rehabilitation of Benta stream + (Removal of sediment)
- Case study:Ecological Restoration of Vlascuta Lake + (Removal of sediment)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Removal of sediment)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Removal of sediment)
- Case study:Blanice River + (Removal of sediment)
- Case study:River Somer channel enhancement, Midsomer Norton + (Removal of sediment)
- Case study:Removal of the Fatou dam on the Beaume river + (Removal of sediment)
- Case study:Dagenham Brook de-silting + (Removal of sediment)
- Case study:Beddington Park + (Removal of sediment)
- Case study:Hackbridge weir notch + (Removal of sediment)
- Case study:Habitat and water flow restoration on River Rábca + (Removal of reed)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Removal of spillway)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold)
- Case study:Environmental design Mandalsvassdraget + (Removal of weirs (9 weirs))
- Case study:More space for the river Orbigo + (Removal/retreat of embankments)
- Case study:HLS New Forest + (Bed raising)
- Case study:Brent River Park Phase II + (Removing of concrete structures)
- Case study:Linear Park + (Bank reprofiling)
- Case study:Fordmill weir + (Bank reprofiling)
- Case study:Lewisham College weir + (Removing of concrete structures)
- Case study:River Brent at Brent Cross + (Removing of concrete structures)
- Case study:Rainham Creek Tidal Sluice Removal + (Removing of concrete structures)
- Case study:Teddington Wharf + (Removing of concrete structures)
- Case study:Mottingham Farm + (Bank reprofiling)
- Case study:Ladywell Fields to Cornmill Gardens + (Bank reprofiling)
- Case study:Manor House Gardens + (Removing of concrete structures)